Detailed Project Report for Vehicular Tunnel System from Hebbal to Silk Board
Credits: DT Devare
Views: 0
Files
-
Executive Summary of the DPR - September 2024
Executive Summary of the Detailed Project Report for the Tunnel system from Hebbal to Silk Board. The document is dated September 2024.
Licence: Public Domain
Views: 0
-
DPR Volume 1 With Annexure - Sept 2024
Main Report of the Detailed Project Report of the Tunnel Road System in Bengaluru
Licence: Public Domain
Views: 0
-
DPR Volume 2A - Geotech Design Report - Sept 2024
Geotech Design Report of the Vehicular Tunnel System.
Licence: Public Domain
Views: 0
-
DPR Volume 2B - Structural Design Report - Sept 2024
Structural Design Report of the DPR for the Vehicular Tunnel System.
Licence: Public Domain
Views: 0
-
DPR Volume 2C - Electrical Design Report - September 2024
Electrical design report for the Vehicular Tunnel System.
Licence: Public Domain
Views: 0
-
DPR Volume 2D - Ventilation Design Report
Ventilation Design Report of the Tunnel System
Licence: Public Domain
Views: 0
-
DPR Volume 3 - Geotechnical Interpretive Report - Sept 2024
Geotechnical Interpretive Report (GIR) for the tunnel roads between Hebbal and Silk Board.
Licence: Public Domain
Views: 0
-
DPR Volume 4 - Preliminary Cost - Sept 2024
Preliminary cost details of the vehicular tunnel system
Licence: Public Domain
Views: 0
Please Sign in to write a response