<0>11183-21-0000142022-03-04T00:00:002022-06-01T00:00:00Desilting and improvements balance drains and roads in Chikkalasandra in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3852 Special Development works at Malleshwaram, Mahalakshmi layout, CV Raman Nagara, Rajajinagara, Govindarajanagara, Chickpet, Basavanagudi, Padmanabhanagara Constituencies (Rs. 20.00 Cr. Per constituency)022344 CHELUVARAJU D9886430370First and Final0000882022-03-04T00:00:0000001212-Jul-2022
000030

12-Jul-2022
Under Process in TVCC Chief Engineer2014438Twenty Lakh Fourteen Thousand Four Hundred Thirty Eight209707Two Lakh Nine Thousand Seven Hundred Seven1804731Eighteen Lakh Four Thousand Seven Hundred Thirty One
<0>22183-20-0000382021-07-06T00:00:002021-08-18T00:00:00Improvements culverts at Bhuvaneshwarinagar in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsKAVITHA H S9535502256First and Final0000372021-07-06T00:00:0000006507-Oct-2021
000106

08-Oct-2021
Under Process in AdCf - Acts. Supdt.367070Three Lakh Sixty Seven Thousand Seventy 32210Thirty Two Thousand Two Hundred Ten334860Three Lakh Thirty Four Thousand Eight Hundred Sixty
<0>33183-20-0000392021-06-30T00:00:002021-08-12T00:00:00Improvements to drain near Nandi enclave apartment in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsDOLPHIN CONSTRUCTION8147814780First and Final0000352021-06-30T00:00:0000006024-Aug-2021
000094

24-Aug-2021
000432 / 31-Mar-2022 in RTGS826230Eight Lakh Twenty Six Thousand Two Hundred Thirty 74870Seventy Four Thousand Eight Hundred Seventy 751360Seven Lakh Fifty One Thousand Three Hundred Sixty
<0>44183-20-0000242021-05-18T00:00:002021-07-08T00:00:00Improvements to drains and RCC roads and Re-construction of culverts at 7th cross 8th Cross, 9th Cross and surrounding areas at Hnumagirinagar in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3739 Special development works in Ward No. 01, 03, 04, 05, 09, 10, 13, 15, 17, 19, 20, 26, 27, 28, 29, 34, 35, 36, 39, 43, 45, 46, 51, 52, 57, 64, 65, 71, 79, 83, 85, 88, 89,93, 96, 100, 101, 103,104, 105, 108, 109, 111, 114, 115, 119, 123, 124, 125, 126, 127, 128, 129, 130, 132, 133, 137, 138, 142, 143, 146, 149, 150, 154, 155, 156, 158, 159, 160, 161, 162, 163, 164, 165, 166, 167, 168, 170, 173, 174, 175, 177, 178, 179, 181, 182, 183, 184, 185, 186, 187, 188, 189, 191, 193, 194, 195, 196 ( Total 98 wards 2.50 crors for each ward)A.N.NARASIMHAIAH 7259223456First and Final0000242021-05-18T00:00:0000004317-Jul-2021
000065

17-Jul-2021
000082 / 09-May-2022 in RTGS9382880Ninety Three Lakh Eighty Two Thousand Eight Hundred Eighty 5172880Fifty One Lakh Seventy Two Thousand Eight Hundred Eighty 4210000Fourty Two Lakh Ten Thousand
<0>55183-21-0000092021-04-08T00:00:002021-07-01T00:00:00Improvements to balance cement concrete roads in ward no 183 Chikkalsandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsJAYANTH M8147108984First and Final0000062021-04-08T00:00:0000007218-Nov-2021
000118

18-Nov-2021
Under Process in AdCf - Acts. Supdt.3997340Thirty Nine Lakh Ninety Seven Thousand Three Hundred Fourty 392690Three Lakh Ninety Two Thousand Six Hundred Ninety 3604650Thirty Six Lakh Four Thousand Six Hundred Fifty
<0>66183-20-0000252021-04-08T00:00:002021-06-17T00:00:00Improvements to drains and RCC roads and Re-construction of culverts at 6th cross 7th cross 7th A Cross, 8th Cross, 8th A cross and surrounding area at Bhuvaneshwarinagar in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3739 Special development works in Ward No. 01, 03, 04, 05, 09, 10, 13, 15, 17, 19, 20, 26, 27, 28, 29, 34, 35, 36, 39, 43, 45, 46, 51, 52, 57, 64, 65, 71, 79, 83, 85, 88, 89,93, 96, 100, 101, 103,104, 105, 108, 109, 111, 114, 115, 119, 123, 124, 125, 126, 127, 128, 129, 130, 132, 133, 137, 138, 142, 143, 146, 149, 150, 154, 155, 156, 158, 159, 160, 161, 162, 163, 164, 165, 166, 167, 168, 170, 173, 174, 175, 177, 178, 179, 181, 182, 183, 184, 185, 186, 187, 188, 189, 191, 193, 194, 195, 196 ( Total 98 wards 2.50 crors for each ward)GOUTHAM CONSTRUCTION9900100668First and Final0000032021-04-08T00:00:0000004130-Jun-2021
000061

30-Jun-2021
Under Process in AdCf - Acts. Supdt.9919859Ninety Nine Lakh Nineteen Thousand Eight Hundred Fifty Nine829393Eight Lakh Twenty Nine Thousand Three Hundred Ninety Three9090466Ninety Lakh Ninety Thousand Four Hundred Sixty Six
<0>77183-20-0000262021-04-08T00:00:002021-06-17T00:00:00Construction of RCC Culverts, Improvements to drains and RCC roads 12th main road and surrounding area at Bhuvaneshwarinagar in ward no 183 Chikkalasandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3739 Special development works in Ward No. 01, 03, 04, 05, 09, 10, 13, 15, 17, 19, 20, 26, 27, 28, 29, 34, 35, 36, 39, 43, 45, 46, 51, 52, 57, 64, 65, 71, 79, 83, 85, 88, 89,93, 96, 100, 101, 103,104, 105, 108, 109, 111, 114, 115, 119, 123, 124, 125, 126, 127, 128, 129, 130, 132, 133, 137, 138, 142, 143, 146, 149, 150, 154, 155, 156, 158, 159, 160, 161, 162, 163, 164, 165, 166, 167, 168, 170, 173, 174, 175, 177, 178, 179, 181, 182, 183, 184, 185, 186, 187, 188, 189, 191, 193, 194, 195, 196 ( Total 98 wards 2.50 crors for each ward)GOUTHAM CONSTRUCTION9900100668First and Final0000042021-04-08T00:00:0000004030-Jun-2021
000060

30-Jun-2021
Under Process in AdCf - Acts. Supdt.6254430Sixty Two Lakh Fifty Four Thousand Four Hundred Thirty 549290Five Lakh Fourty Nine Thousand Two Hundred Ninety 5705140Fifty Seven Lakh Five Thousand One Hundred Fourty
<0>88183-21-0000082021-03-30T00:00:002021-06-14T00:00:00Improvements culverts in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsB S CHANDRASHEKHAR 9448572720First and Final0001962021-03-30T00:00:0000004830-Jul-2021
000077

30-Jul-2021
000185 / 18-Jun-2022 in RTGS3647390Thirty Six Lakh Fourty Seven Thousand Three Hundred Ninety 319850Three Lakh Nineteen Thousand Eight Hundred Fifty 3327540Thirty Three Lakh Twenty Seven Thousand Five Hundred Fourty
<0>99183-21-0000072021-03-26T00:00:002021-05-27T00:00:00Desilting and improvements balance drains in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsSURYA ASSOCIATES9880188085First and Final0001802021-03-26T00:00:0000008019-Jan-2022
000137

20-Jan-2022
Under Process in AdCf - Acts. Supdt.2315350Twenty Three Lakh Fifteen Thousand Three Hundred Fifty 190550One Lakh Ninety Thousand Five Hundred Fifty 2124800Twenty One Lakh Twenty Four Thousand Eight Hundred
<0>1010183-20-0000452021-03-15T00:00:002021-06-11T00:00:00Providing name board in Ward No-183. Bhuvaneshwarinagar183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsDOLPHIN CONSTRUCTION8147814780First and Final0001782021-03-15T00:00:0000003616-Jun-2021
000053

16-Jun-2021
000432 / 31-Mar-2022 in RTGS927845Nine Lakh Twenty Seven Thousand Eight Hundred Fourty Five70467Seventy Thousand Four Hundred Sixty Seven857378Eight Lakh Fifty Seven Thousand Three Hundred Seventy Eight
<0>1111183-20-0000472021-03-04T00:00:002021-05-29T00:00:00Emergency works in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksVINAYAKA ENTERPRISES9141944301First and Final0001712021-03-04T00:00:0000004723-Jul-2021
000069

26-Jul-2021
Under Process in AdCf - Acts. Supdt.1937325Nineteen Lakh Thirty Seven Thousand Three Hundred Twenty Five184270One Lakh Eighty Four Thousand Two Hundred Seventy 1753055Seventeen Lakh Fifty Three Thousand Fifty Five
<0>1212183-20-0000512021-03-04T00:00:002021-05-31T00:00:00Providing Rain water Harvesting in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksVINAYAKA ENTERPRISES9141944301First and Final0001692021-03-04T00:00:0000004623-Jul-2021
000068

26-Jul-2021
Under Process in AdCf - Acts. Supdt.966595Nine Lakh Sixty Six Thousand Five Hundred Ninety Five78320Seventy Eight Thousand Three Hundred Twenty 888275Eight Lakh Eighty Eight Thousand Two Hundred Seventy Five
<0>1313183-20-0000462021-01-20T00:00:002021-04-12T00:00:00Providing Re Asphalting to 4th and 5th Main Bhuvaneshwarinagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsKRISHNA.C.9740377357First and Final0001352021-01-20T00:00:0000005617-Aug-2021
000093

23-Aug-2021
Under Process in AdCf - Acts. Supdt.2078820Twenty Lakh Seventy Eight Thousand Eight Hundred Twenty 215170Two Lakh Fifteen Thousand One Hundred Seventy 1863650Eighteen Lakh Sixty Three Thousand Six Hundred Fifty
<0>1414183-21-0000022021-01-20T00:00:002021-05-10T00:00:00Providing and Construction of R C C drain and CC road at 4th cross BDA Layout KEB office surrounding and Kamakya Main road in ward no 183 Chikkalasandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3852 Special Development works at Malleshwaram, Mahalakshmi layout, CV Raman Nagara, Rajajinagara, Govindarajanagara, Chickpet, Basavanagudi, Padmanabhanagara Constituencies (Rs. 20.00 Cr. Per constituency)KRISHNA.C.9740377357First and Final0001362021-01-20T00:00:0000005817-Aug-2021
000091

18-Aug-2021
Under Process in AdCf - Acts. Supdt.8290210Eighty Two Lakh Ninety Thousand Two Hundred Ten706950Seven Lakh Six Thousand Nine Hundred Fifty 7583260Seventy Five Lakh Eighty Three Thousand Two Hundred Sixty
<0>1515183-21-0000012020-12-01T00:00:002021-03-30T00:00:00Construction of Drains at Flood effected area from 3rd cross Hanumagiri to Kuvempu road W-side of Chikkallasandra main road (Gummaiah Layout boarder) in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3852 Special Development works at Malleshwaram, Mahalakshmi layout, CV Raman Nagara, Rajajinagara, Govindarajanagara, Chickpet, Basavanagudi, Padmanabhanagara Constituencies (Rs. 20.00 Cr. Per constituency)KRISHNA.C.9740377357First and Final0001032020-12-01T00:00:0000005717-Aug-2021
000090

18-Aug-2021
Under Process in AdCf - Acts. Supdt.10196015One Crore One Lakh Ninety Six Thousand Fifteen808410Eight Lakh Eight Thousand Four Hundred Ten9387605Ninety Three Lakh Eighty Seven Thousand Six Hundred Five
<0>1616183-21-0000062020-12-22T00:00:002021-06-16T00:00:00Providing out door gym and children equipments at Park in ward no 183183 ChikkalsandraExecutive Engineer Project - South ZoneP2415 Reserve fund for TandF CommitteeMr SATISH S9901333577First and Final0001432020-10-09T00:00:0000000619-Apr-2022
000005

20-Apr-2022
Under Process in AdCf - Acts. Supdt.10240684One Crore Two Lakh Fourty Thousand Six Hundred Eighty Four919543Nine Lakh Nineteen Thousand Five Hundred Fourty Three9321141Ninety Three Lakh Twenty One Thousand One Hundred Fourty One
<0>1717183-21-0000052020-12-22T00:00:002021-06-16T00:00:00Improvements to Vishveshwaraiah Park in ward no 183183 ChikkalsandraExecutive Engineer Project - South ZoneP2415 Reserve fund for TandF CommitteeMr SATISH S9901333577First and Final0001422020-10-09T00:00:0000006420-Dec-2021
000063

20-Dec-2021
Under Process in AdCf - Acts. Supdt.10261000One Crore Two Lakh Sixty One Thousand 679938Six Lakh Seventy Nine Thousand Nine Hundred Thirty Eight9581062Ninety Five Lakh Eighty One Thousand Sixty Two
<0>1818183-21-0000032020-12-22T00:00:002021-06-16T00:00:00Improvements to Bhuvaneshwari Park in ward no 183183 ChikkalsandraExecutive Engineer Project - South ZoneP2415 Reserve fund for TandF CommitteeMr SATISH S9901333577First and Final0001402020-10-09T00:00:0000006314-Dec-2021
000061

16-Dec-2021
Under Process in AdCf - Acts. Supdt.10249600One Crore Two Lakh Fourty Nine Thousand Six Hundred 694130Six Lakh Ninety Four Thousand One Hundred Thirty 9555470Ninety Five Lakh Fifty Five Thousand Four Hundred Seventy
<0>1919183-21-0000042020-12-22T00:00:002021-06-16T00:00:00Improvements to Kuvempu Park in ward no 183183 ChikkalsandraExecutive Engineer Project - South ZoneP2415 Reserve fund for TandF CommitteeMr SATISH S9901333577First and Final0001412020-10-09T00:00:0000006214-Dec-2021
000062

16-Dec-2021
Under Process in AdCf - Acts. Supdt.10268000One Crore Two Lakh Sixty Eight Thousand 703314Seven Lakh Three Thousand Three Hundred Fourteen9564686Ninety Five Lakh Sixty Four Thousand Six Hundred Eighty Six
<0>2020183-20-0000422020-09-30T00:00:002020-12-16T00:00:00Providing cement concrete in 6th Main Bhuvaneshwarinagar in Ward No-183. (W0248)183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsMr RAJIV SATYANARA9035274994First and Final0000742020-09-30T00:00:0000006815-Feb-2021
000015

23-Apr-2021
000114 / 19-May-2022 in RTGS1578780Fifteen Lakh Seventy Eight Thousand Seven Hundred Eighty 166680One Lakh Sixty Six Thousand Six Hundred Eighty 1412100Fourteen Lakh Twelve Thousand One Hundred
<0>2121183-20-0000402020-09-25T00:00:002020-12-18T00:00:00Providing cement concrete 3rd A cross Bhuvaneshwarinagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsHEMANTH KUMAR R9448067458First and Final0000692020-09-25T00:00:0000005331-Dec-2020
000136

31-Dec-2020
000075 / 14-Jun-2021 in RTGS1393970Thirteen Lakh Ninety Three Thousand Nine Hundred Seventy 155350One Lakh Fifty Five Thousand Three Hundred Fifty 1238620Twelve Lakh Thirty Eight Thousand Six Hundred Twenty
<0>2222183-20-0000442020-09-23T00:00:002020-12-17T00:00:00Providing cement concrete to Syndicate bank colony in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsSHIVAKUMARA SWAMY9686378888First and Final0000632020-09-23T00:00:0000006028-Jan-2021
000150

28-Jan-2021
000075 / 14-Jun-2021 in RTGS1226010Twelve Lakh Twenty Six Thousand Ten152420One Lakh Fifty Two Thousand Four Hundred Twenty 1073590Ten Lakh Seventy Three Thousand Five Hundred Ninety
<0>2323183-20-0000412020-09-23T00:00:002020-12-18T00:00:00Providing cement concrete and Improvements drain 2nd A Ittamadu road Near Rama Anjanaiah Temple in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsSHIVAKUMARA SWAMY9686378888First and Final0000622020-09-23T00:00:0000005131-Dec-2020
000134

31-Dec-2020
000075 / 14-Jun-2021 in RTGS1180650Eleven Lakh Eighty Thousand Six Hundred Fifty 135470One Lakh Thirty Five Thousand Four Hundred Seventy 1045180Ten Lakh Fourty Five Thousand One Hundred Eighty
<0>2424183-20-0000432020-09-23T00:00:002020-12-18T00:00:00Providing cement concrete Ramana Rastriya Vidayala Hanumaginagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3726 Zonal Public Works - POW Works -60per for Annual Maintenance and Re-asphalting of roads in Ward jurisdiction -Escrow Account - Old Ward Rs.1.20 Cr per ward and Rs.1.80 Cr for new wardsSHIVAKUMARA SWAMY9686378888First and Final0000662020-09-23T00:00:0000005231-Dec-2020
000135

31-Dec-2020
000075 / 14-Jun-2021 in RTGS811880Eight Lakh Eleven Thousand Eight Hundred Eighty 98710Ninety Eight Thousand Seven Hundred Ten713170Seven Lakh Thirteen Thousand One Hundred Seventy
<0>2525183-20-0000102020-03-11T00:00:002021-02-18T00:00:00Maintenance of special gangman and Depot collection in ward no-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHEMANTH V9900093411First and Final0002582020-03-11T00:00:0000007023-Feb-2021
000164

23-Feb-2021
Under Process in AdCf - Acts. Supdt.665040Six Lakh Sixty Five Thousand Fourty 46570Fourty Six Thousand Five Hundred Seventy 618470Six Lakh Eighteen Thousand Four Hundred Seventy
<0>2626183-20-0000112020-02-07T00:00:002021-01-25T00:00:00Patchwork for Pothole and road cutting in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksM JAYANTH9964587191First and Final0002232020-02-07T00:00:0000006721-Oct-2021
000112

25-Oct-2021
Under Process in AdCf - Acts. Supdt.1993375Nineteen Lakh Ninety Three Thousand Three Hundred Seventy Five179330One Lakh Seventy Nine Thousand Three Hundred Thirty 1814045Eighteen Lakh Fourteen Thousand Fourty Five
<0>2727183-20-0000142019-12-23T00:00:002021-01-27T00:00:00Ward Area Maintenance in Ward no-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHEMANTH V9900093411First and Final0001732019-12-23T00:00:0000007426-Feb-2021
000169

26-Feb-2021
Under Process in AdCf - Acts. Supdt.1048295Ten Lakh Fourty Eight Thousand Two Hundred Ninety Five73060Seventy Three Thousand Sixty 975235Nine Lakh Seventy Five Thousand Two Hundred Thirty Five
<0>2828183-20-0000072019-11-07T00:00:002019-12-27T00:00:00Improvements to drain and Providing cement concrete to 8th A Cross Ittamadu in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksMr RAJIV SATYANARA9035274994First and Final0001092019-11-07T00:00:0000012027-Feb-2020
000246

28-Feb-2020
000104 / 16-May-2022 in RTGS1378200Thirteen Lakh Seventy Eight Thousand Two Hundred 141580One Lakh Fourty One Thousand Five Hundred Eighty 1236620Twelve Lakh Thirty Six Thousand Six Hundred Twenty
<0>2929183-20-0000032019-10-01T00:00:002019-11-11T00:00:00Improvements to drain and Providing cement concrete to 10th B Cross Ittamadu in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksPRAVEEN KUMAR T 9845037333First and Final0000872019-10-01T00:00:0000009328-Nov-2019
000194

29-Nov-2019
000040 / 25-Apr-2022 in RTGS855000Eight Lakh Fifty Five Thousand 94540Ninety Four Thousand Five Hundred Fourty 760460Seven Lakh Sixty Thousand Four Hundred Sixty
<0>3030183-20-0000042019-10-01T00:00:002019-11-14T00:00:00Improvements to drain and Providing cement concrete to 10th C Cross Ittamadu in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksPRAVEEN KUMAR T 9845037333First and Final0000882019-10-01T00:00:0000009428-Nov-2019
000195

29-Nov-2019
000040 / 25-Apr-2022 in RTGS828570Eight Lakh Twenty Eight Thousand Five Hundred Seventy 92890Ninety Two Thousand Eight Hundred Ninety 735680Seven Lakh Thirty Five Thousand Six Hundred Eighty
<0>3131183-20-0000062019-08-31T00:00:002019-11-06T00:00:00Improvements to drain and Providing cement concrete to 1st Cross Hanumagiri layout from Chikkalasandra Main road in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksMr SRINIVAS T 9880329333First and Final0000792019-08-31T00:00:0000009528-Nov-2019
000196

29-Nov-2019
000040 / 25-Apr-2022 in RTGS1694220Sixteen Lakh Ninety Four Thousand Two Hundred Twenty 187180One Lakh Eighty Seven Thousand One Hundred Eighty 1507040Fifteen Lakh Seven Thousand Fourty
<0>3232183-18-0000252019-08-21T00:00:002019-11-07T00:00:00Improvements to drain in Surrounding area of Kengal Hanumanthaiah road in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3330 Special Development works at Ward No.92,98,108,128,173,174,181,183 ( 8 wards Rs.2.00 Cr. Each)SREEDHARA.K.C9901698462First and Final0000622019-08-21T00:00:0000009827-Dec-2019
000211

27-Dec-2019
000064 / 30-Apr-2022 in RTGS2707400Twenty Seven Lakh Seven Thousand Four Hundred 262960Two Lakh Sixty Two Thousand Nine Hundred Sixty 2444440Twenty Four Lakh Fourty Four Thousand Four Hundred Fourty
<0>3333183-20-0000122019-08-21T00:00:002019-11-07T00:00:00Providing box drain 5th cross Om Shakthi temple Hanumagiri in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksSREEDHARA.K.C9901698462First and Final0000632019-08-21T00:00:0000009727-Dec-2019
000210

27-Dec-2019
000064 / 30-Apr-2022 in RTGS1384990Thirteen Lakh Eighty Four Thousand Nine Hundred Ninety 141840One Lakh Fourty One Thousand Eight Hundred Fourty 1243150Twelve Lakh Fourty Three Thousand One Hundred Fifty
<0>3434183-18-0000332019-07-24T00:00:002019-08-24T00:00:00Emergency Electrical repairs in ward 183 183 ChikkalsandraExecutive Engineer Electrical South ZoneP0303 M and R to Pumpsets, Lifts, DG Sets, Wireless sets and Internal Telephone ExchangeSRI MUTHATHI ELEC9980119080First and Final0000722019-07-24T00:00:0000024801-Feb-2020
000248

01-Feb-2020
000104 / 16-May-2022 in RTGS75612Seventy Five Thousand Six Hundred Twelve2344Two Thousand Three Hundred Fourty Four73268Seventy Three Thousand Two Hundred Sixty Eight
<0>3535183-19-0000232019-07-01T00:00:002019-07-23T00:00:00Providing External Lighting to Indira Canteen at ward no 183 Chikkallasandra183 ChikkalsandraExecutive Engineer Electrical South ZoneP3106 Nagarothana WorksExecutive Engineer -3, KRIDL0First and Final0000542019-07-01T00:00:0000011907-Aug-2019
000116

07-Aug-2019
000155 / 12-Aug-2021 in RTGS135585One Lakh Thirty Five Thousand Five Hundred Eighty Five14373Fourteen Thousand Three Hundred Seventy Three121212One Lakh Twenty One Thousand Two Hundred Twelve
<0>3636183-18-0000272019-06-28T00:00:002019-08-28T00:00:00Improvements to drain and providing to Cement concrete road to 4th main Ittumadu road in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3330 Special Development works at Ward No.92,98,108,128,173,174,181,183 ( 8 wards Rs.2.00 Cr. Each)RAVINDRA D9481314316First and Final0000392019-06-28T00:00:0000007331-Aug-2019
000146

31-Aug-2019
685116-Dec-2019000308 / 17-Dec-2019 in RTGS4987580Fourty Nine Lakh Eighty Seven Thousand Five Hundred Eighty 528110Five Lakh Twenty Eight Thousand One Hundred Ten4459470Fourty Four Lakh Fifty Nine Thousand Four Hundred Seventy
<0>3737183-18-0000302019-06-21T00:00:002019-08-27T00:00:00Improvements to drain and footpath in Ittamadu road in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3250 Special Development works at ward Ward No.29 Rs.4 Cr, Ward 103,183,161,174,057,027 Rs.1 Cr each, Ward No.052,050,051,170,169,178 Each ward Rs.50.00 Lakhs, Bengaluru South Constituency Rs.2.00 Cr, Ward No 103,Rs.13.00 Cr, Ward No.171 Rs.20.00 Cr, Ward No.19 Rs.8 Cr. Ward No.104 Rs.5 Cr EachVISHWANATH P9986457680First and Final0000362019-06-21T00:00:0000007720-Sep-2019
000156

20-Sep-2019
000381 / 25-Feb-2022 in RTGS5134730Fifty One Lakh Thirty Four Thousand Seven Hundred Thirty 523140Five Lakh Twenty Three Thousand One Hundred Fourty 4611590Fourty Six Lakh Eleven Thousand Five Hundred Ninety
<0>3838183-18-0000282019-05-18T00:00:002019-08-05T00:00:00Improvements to drain and providing to Cement concrete to 5th Cross Ittumadu road in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3330 Special Development works at Ward No.92,98,108,128,173,174,181,183 ( 8 wards Rs.2.00 Cr. Each)Technical Manager (3), Karnataka Rural Infrastructure Development Limited (KRIDL)9986697126First and Final0000252019-05-18T00:00:0000006827-Aug-2019
000136

28-Aug-2019
000239 / 11-Oct-2021 in RTGS4875190Fourty Eight Lakh Seventy Five Thousand One Hundred Ninety 545310Five Lakh Fourty Five Thousand Three Hundred Ten4329880Fourty Three Lakh Twenty Nine Thousand Eight Hundred Eighty
<0>3939183-19-0000252019-04-03T00:00:002019-04-26T00:00:00Providing Assured Minimum Facilities (AMF) to all polling Stations of Lokasabha Elections - 2019 pertains to ward No.183 183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0054 Election expensesRAVINDRA D9481314316First and Final0000062019-04-03T00:00:0000002513-May-2019
000070

21-Jun-2019
000215 / 29-Sep-2021 in RTGS280760Two Lakh Eighty Thousand Seven Hundred Sixty 10940Ten Thousand Nine Hundred Fourty 269820Two Lakh Sixty Nine Thousand Eight Hundred Twenty
<0>4040183-19-0000042019-02-23T00:00:002019-03-06T00:00:00Providing street light fittings, Timer Park fittings to Bhuvaneshwari Nagar surrounding areas in ward no 183183 ChikkalsandraExecutive Engineer Electrical South ZoneP3520 Developmental works at ward No.10, 17, 43, 45, 52, 57, 64, 68, 79, 89, 93, 96, 97, 108, 109, 124, 51, 53, 55, 81, 87, 116, 118, 128, 132, 134, 151, 160, 166, 167, 170, 178, 183, 187, 189 198 Rs.2.00 Cr eachExecutive Engineer -3, KRIDL0First and Final0001662019-02-23T00:00:0000021812-Mar-2019
000221

12-Mar-2019
000076 / 14-Jun-2021 in RTGS9982685Ninety Nine Lakh Eighty Two Thousand Six Hundred Eighty Five1236427Twelve Lakh Thirty Six Thousand Four Hundred Twenty Seven8746258Eighty Seven Lakh Fourty Six Thousand Two Hundred Fifty Eight
<0>4141183-19-0000052019-02-23T00:00:002019-03-06T00:00:00Providing street light fittings, Timer Park fittings to Chikkallasandra surrounding areas in ward no 183183 ChikkalsandraExecutive Engineer Electrical South ZoneP3520 Developmental works at ward No.10, 17, 43, 45, 52, 57, 64, 68, 79, 89, 93, 96, 97, 108, 109, 124, 51, 53, 55, 81, 87, 116, 118, 128, 132, 134, 151, 160, 166, 167, 170, 178, 183, 187, 189 198 Rs.2.00 Cr eachExecutive Engineer -3, KRIDL0First and Final0001642019-02-23T00:00:0000021912-Mar-2019
000220

12-Mar-2019
000076 / 14-Jun-2021 in RTGS9982685Ninety Nine Lakh Eighty Two Thousand Six Hundred Eighty Five1236427Twelve Lakh Thirty Six Thousand Four Hundred Twenty Seven8746258Eighty Seven Lakh Fourty Six Thousand Two Hundred Fifty Eight
<0>4242183-18-0000162019-02-22T00:00:002019-05-22T00:00:00Providing Asphalting to Syndicate bank colony in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksV L MUNIRAJU9986072837First and Final0001912019-02-22T00:00:0000003330-May-2019
000053

31-May-2019
000135 / 04-Aug-2021 in RTGS3745540Thirty Seven Lakh Fourty Five Thousand Five Hundred Fourty 383760Three Lakh Eighty Three Thousand Seven Hundred Sixty 3361780Thirty Three Lakh Sixty One Thousand Seven Hundred Eighty
<0>4343183-18-0000242018-12-28T00:00:002019-05-02T00:00:00Development works to the parks, in Ward No. 183, Chikkalasandra183 ChikkalsandraExecutive Engineer Project - South ZoneP3250 Special Development works at ward Ward No.29 Rs.4 Cr, Ward 103,183,161,174,057,027 Rs.1 Cr each, Ward No.052,050,051,170,169,178 Each ward Rs.50.00 Lakhs, Bengaluru South Constituency Rs.2.00 Cr, Ward No 103,Rs.13.00 Cr, Ward No.171 Rs.20.00 Cr, Ward No.19 Rs.8 Cr. Ward No.104 Rs.5 Cr EachSATISH R9880866688First and Final0000802019-02-15T00:00:0000004402-Aug-2019
000096

07-Nov-2019
000040 / 25-Apr-2022 in RTGS3729465Thirty Seven Lakh Twenty Nine Thousand Four Hundred Sixty Five392335Three Lakh Ninety Two Thousand Three Hundred Thirty Five3337130Thirty Three Lakh Thirty Seven Thousand One Hundred Thirty
<0>4444183-18-0000122019-01-25T00:00:002019-04-22T00:00:00Construction of drains, cement concrete road to 8th A Cross and surrounding area in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksJAYANTH M9964587191First and Final0001482019-01-25T00:00:0000003928-Jun-2019
000083

29-Jun-2019
000220 / 04-Oct-2021 in RTGS2958550Twenty Nine Lakh Fifty Eight Thousand Five Hundred Fifty 307280Three Lakh Seven Thousand Two Hundred Eighty 2651270Twenty Six Lakh Fifty One Thousand Two Hundred Seventy
<0>4545183-18-0000312019-01-21T00:00:002019-04-19T00:00:00Providing grill work to Bhuvaneshwari nagar in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3250 Special Development works at ward Ward No.29 Rs.4 Cr, Ward 103,183,161,174,057,027 Rs.1 Cr each, Ward No.052,050,051,170,169,178 Each ward Rs.50.00 Lakhs, Bengaluru South Constituency Rs.2.00 Cr, Ward No 103,Rs.13.00 Cr, Ward No.171 Rs.20.00 Cr, Ward No.19 Rs.8 Cr. Ward No.104 Rs.5 Cr EachN VENKATESH9341225619First and Final0001462019-01-21T00:00:0000003028-May-2019
000044

28-May-2019
000130 / 02-Aug-2021 in RTGS4319060Fourty Three Lakh Nineteen Thousand Sixty 417860Four Lakh Seventeen Thousand Eight Hundred Sixty 3901200Thirty Nine Lakh One Thousand Two Hundred
<0>4646183-18-0000142018-11-05T00:00:002018-12-18T00:00:00Emergency Works in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksSIDDEGOWDA D9341337834First and Final0001302018-11-05T00:00:0000008327-Dec-2018
000163

27-Dec-2018
000018 / 04-May-2021 in RTGS1749360Seventeen Lakh Fourty Nine Thousand Three Hundred Sixty 203035Two Lakh Three Thousand Thirty Five1546325Fifteen Lakh Fourty Six Thousand Three Hundred Twenty Five
<0>4747183-18-0000222018-10-29T00:00:002019-08-30T00:00:00Ward Area Maintenance in Ward no-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA.N.NARASIMHAIAH 7259223456First and Final0001282018-10-29T00:00:0000000830-May-2020
000021

30-May-2020
000151 / 07-Jun-2022 in RTGS1197980Eleven Lakh Ninety Seven Thousand Nine Hundred Eighty 106600One Lakh Six Thousand Six Hundred 1091380Ten Lakh Ninety One Thousand Three Hundred Eighty
<0>4848183-18-0000322018-10-10T00:00:002018-11-23T00:00:00Development works to Indira Canteen premises in Word no- 183 Chikkalasandra. 183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3106 Nagarothana WorksTECHNICAL MANAGER (3) KRIDL9986697126First and Final0001182018-10-10T00:00:0000007503-Dec-2018
000147

03-Dec-2018
804617-Dec-2018000311 / 02-Jan-2019 in RTGS1173880Eleven Lakh Seventy Three Thousand Eight Hundred Eighty 157075One Lakh Fifty Seven Thousand Seventy Five1016805Ten Lakh Sixteen Thousand Eight Hundred Five
<0>4949183-18-0000152018-09-03T00:00:002019-09-02T00:00:00Patchwork for Pothole and road cutting in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksNANDINI H S PROP OF IMPANA CONSTRUCTIONS9845187748First and Final0000982018-09-03T00:00:0000005723-Jul-2019
000112

24-Jul-2019
000134 / 02-Aug-2021 in RTGS1685920Sixteen Lakh Eighty Five Thousand Nine Hundred Twenty 195420One Lakh Ninety Five Thousand Four Hundred Twenty 1490500Fourteen Lakh Ninety Thousand Five Hundred
<0>5050183-18-0000112018-08-14T00:00:002018-10-25T00:00:00Construction culverts surrounding area of 2nd B and C cross Near Om Shakthi temple in ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksSrinivasa.G Prop of Mookambika Civil Works8546994209First and Final0000862018-08-14T00:00:0000009814-Feb-2019
000187

14-Feb-2019
000067 / 08-Jun-2021 in RTGS803200Eight Lakh Three Thousand Two Hundred 81114Eighty One Thousand One Hundred Fourteen722086Seven Lakh Twenty Two Thousand Eighty Six
<0>5151183-18-0000012018-07-30T00:00:002019-07-15T00:00:00Improvements to roads and drains Syndicate Bank Colony in Chikkakalsandra ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0541 Commissioner Discretionary GrantsTECHNICAL MANAGER (3) KRIDL9986697126First and Final0000652018-07-28T00:00:0000008623-Oct-2019
000173

23-Oct-2019
852011-Feb-2020000399 / 14-Feb-2020 in RTGS2996950Twenty Nine Lakh Ninety Six Thousand Nine Hundred Fifty 496950Four Lakh Ninety Six Thousand Nine Hundred Fifty 2500000Twenty Five Lakh
<0>5252183-18-0000022018-07-28T00:00:002018-10-25T00:00:00Improvements to Roads and Drains Bhuvaneshwarinagara main road and cross road in Chikkakalsandra ward 183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0541 Commissioner Discretionary GrantsTECHNICAL MANAGER (3) KRIDL9986697126First and Final0000662018-07-28T00:00:0000005016-Jul-2019
000104

17-Jul-2019
000225 / 05-Oct-2021 in RTGS3489390Thirty Four Lakh Eighty Nine Thousand Three Hundred Ninety 396600Three Lakh Ninety Six Thousand Six Hundred 3092790Thirty Lakh Ninety Two Thousand Seven Hundred Ninety
<0>5353183-18-0000032018-07-28T00:00:002018-10-25T00:00:00Improvements to Roads and Drains Ittmadu main road and cross road in ward no 183 Chikkakalsandra.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0541 Commissioner Discretionary GrantsTECHNICAL MANAGER (3) KRIDL9986697126First and Final0000692018-07-28T00:00:0000004916-Jul-2019
000103

17-Jul-2019
851911-Feb-2020000399 / 14-Feb-2020 in RTGS2978980Twenty Nine Lakh Seventy Eight Thousand Nine Hundred Eighty 478980Four Lakh Seventy Eight Thousand Nine Hundred Eighty 2500000Twenty Five Lakh
<0>5454183-18-0000042018-07-28T00:00:002018-10-26T00:00:00Improvements to Roads and Drains Kuvempunagar and Kakathiyanagar surroundings in ward no 183 Chikkakalsandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0541 Commissioner Discretionary GrantsTECHNICAL MANAGER (3) KRIDL9986697126First and Final0000672018-07-28T00:00:0000004816-Jul-2019
000102

17-Jul-2019
851811-Feb-2020000399 / 14-Feb-2020 in RTGS2999660Twenty Nine Lakh Ninety Nine Thousand Six Hundred Sixty 499660Four Lakh Ninety Nine Thousand Six Hundred Sixty 2500000Twenty Five Lakh
<0>5555183-18-0000172018-07-24T00:00:002018-10-24T00:00:00Providing cement concrete to 10th Cross, cross road at Bhuvaneshwari Nagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksVARUN K9731120853First and Final0000412018-07-24T00:00:0000009110-Jan-2019
000178

14-Jan-2019
000067 / 08-Jun-2021 in RTGS830375Eight Lakh Thirty Thousand Three Hundred Seventy Five97975Ninety Seven Thousand Nine Hundred Seventy Five732400Seven Lakh Thirty Two Thousand Four Hundred
<0>5656183-18-0000192018-07-24T00:00:002018-09-21T00:00:00Providing cement concrete to 1st Main road Near 10th cross at Bhuvaneshwari Nagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksVARUN K9731120853First and Final0000422018-07-24T00:00:0000009010-Jan-2019
000177

14-Jan-2019
000053 / 01-Jun-2021 in RTGS830520Eight Lakh Thirty Thousand Five Hundred Twenty 97750Ninety Seven Thousand Seven Hundred Fifty 732770Seven Lakh Thirty Two Thousand Seven Hundred Seventy
<0>5757183-18-0000212018-07-24T00:00:002018-08-29T00:00:00Providing cement concrete to web star school 3rd Cross in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksVARUN K9731120853First and Final0000432018-07-24T00:00:0000008910-Jan-2019
000176

14-Jan-2019
000053 / 01-Jun-2021 in RTGS830215Eight Lakh Thirty Thousand Two Hundred Fifteen97795Ninety Seven Thousand Seven Hundred Ninety Five732420Seven Lakh Thirty Two Thousand Four Hundred Twenty
<0>5858183-18-0000202018-07-24T00:00:002018-10-16T00:00:00Providing cement concrete to 8th Main road Sri Ramanagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksB C SUKUMAR9663453136First and Final0000472018-07-24T00:00:0000005827-Oct-2018
000122

27-Oct-2018
185113-Jul-2020000184 / 20-Jul-2020 in RTGS1253390Twelve Lakh Fifty Three Thousand Three Hundred Ninety 135570One Lakh Thirty Five Thousand Five Hundred Seventy 1117820Eleven Lakh Seventeen Thousand Eight Hundred Twenty
<0>5959183-18-0000132018-07-21T00:00:002019-06-01T00:00:00Depot collection in ward no-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksV HEMANTH9900093411First and Final0000392018-07-21T00:00:0000004128-Jun-2019
000082

29-Jun-2019
000134 / 02-Aug-2021 in RTGS748205Seven Lakh Fourty Eight Thousand Two Hundred Five73205Seventy Three Thousand Two Hundred Five675000Six Lakh Seventy Five Thousand
<0>6060183-18-0000182018-06-18T00:00:002018-09-17T00:00:00Providing cement concrete to 1st main approach road near Ittamadu main road in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksSIDDEGOWDA D9341337834First and Final0000052018-06-18T00:00:0000006029-Oct-2018
000125

29-Oct-2018
185613-Jul-2020000190 / 07-Sep-2020 in RTGS1340500Thirteen Lakh Fourty Thousand Five Hundred 145505One Lakh Fourty Five Thousand Five Hundred Five1194995Eleven Lakh Ninety Four Thousand Nine Hundred Ninety Five
<0>6161183-17-0000112018-02-08T00:00:002018-05-05T00:00:00Emergency Works in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksS Muruga Rajendra Pro of Ruthu Enterprises9448807388First and Final0000952018-02-08T00:00:0000003325-Jul-2018
000060

27-Jul-2018
790321-Jan-2020000365 / 28-Jan-2020 in RTGS1453600Fourteen Lakh Fifty Three Thousand Six Hundred 218915Two Lakh Eighteen Thousand Nine Hundred Fifteen1234685Twelve Lakh Thirty Four Thousand Six Hundred Eighty Five
<0>6262183-17-0000132018-01-20T00:00:002018-01-31T00:00:00Providing Name Boards in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksV HEMANTH9900093411First and Final0000892018-01-20T00:00:0000006826-Feb-2018
000121

28-Feb-2018
398725-Jul-2019000135 / 31-Jul-2019 in RTGS366060Three Lakh Sixty Six Thousand Sixty 35205Thirty Five Thousand Two Hundred Five330855Three Lakh Thirty Thousand Eight Hundred Fifty Five
<0>6363183-17-0000312018-01-06T00:00:002018-07-02T00:00:00Asphalting to Bhuvaneshwari Nagar main roads and cross roads and improvements to Road side drains and footpath in ward no 183 Chikkalsandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3181 Developmental Works in Ward no 183, 29, 190, 177, 168, 13, 14, 3, 4, 89, 27, 126 and 132TECHNICAL MANAGER (3) KRIDL9986697126Second and Final0000782018-01-06T00:00:0000007119-Nov-2018
000143

28-Nov-2018
489910-Mar-2021000296 / 16-Mar-2021 in RTGS4436610Fourty Four Lakh Thirty Six Thousand Six Hundred Ten601050Six Lakh One Thousand Fifty 3835560Thirty Eight Lakh Thirty Five Thousand Five Hundred Sixty
<0>6464183-17-0000362018-01-06T00:00:002018-07-04T00:00:00Improvements to Drain and Asphalting to Main roads and cross roads of Ittamadu BDA Layout and Surrounding Area in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3173 Special Development works in ward No.124, 185, 98, 188, 10, 14, 16, 30, 28, 37, 42, 130, 159, 65, 66, 73, 79, 80, 90, 95, 94, 89, 108, 111, 115, 97, 105, 131, 133, 119, 125, 137, 143, 124, 158, 138, 83, 166, 182, 129, 165, 161, 04, 88, 27, 31, 32, 52, 44, 26, 07, 183, 178, 187 (Rs.100 lakhs per ward)TECHNICAL MANAGER (3) KRIDL9986697126Second and Final0000762018-01-06T00:00:0000006331-Oct-2018
000128

31-Oct-2018
199816-Jul-2020000216 / 27-Nov-2020 in RTGS2647895Twenty Six Lakh Fourty Seven Thousand Eight Hundred Ninety Five363640Three Lakh Sixty Three Thousand Six Hundred Fourty 2284255Twenty Two Lakh Eighty Four Thousand Two Hundred Fifty Five
<0>6565183-17-0000362018-01-06T00:00:002018-06-21T00:00:00Improvements to Drain and Asphalting to Main roads and cross roads of Ittamadu BDA Layout and Surrounding Area in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3173 Special Development works in ward No.124, 185, 98, 188, 10, 14, 16, 30, 28, 37, 42, 130, 159, 65, 66, 73, 79, 80, 90, 95, 94, 89, 108, 111, 115, 97, 105, 131, 133, 119, 125, 137, 143, 124, 158, 138, 83, 166, 182, 129, 165, 161, 04, 88, 27, 31, 32, 52, 44, 26, 07, 183, 178, 187 (Rs.100 lakhs per ward)TECHNICAL MANAGER (3) KRIDL9986697126Running0000762018-01-06T00:00:0000002530-Jun-2018
000039

30-Jun-2018
750216-Jan-2020000353 / 18-Jan-2020 in RTGS7227590Seventy Two Lakh Twenty Seven Thousand Five Hundred Ninety 1029955Ten Lakh Twenty Nine Thousand Nine Hundred Fifty Five6197635Sixty One Lakh Ninety Seven Thousand Six Hundred Thirty Five
<0>6666183-17-0000312018-01-06T00:00:002018-03-27T00:00:00Asphalting to Bhuvaneshwari Nagar main roads and cross roads and improvements to Road side drains and footpath in ward no 183 Chikkalsandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3181 Developmental Works in Ward no 183, 29, 190, 177, 168, 13, 14, 3, 4, 89, 27, 126 and 132TECHNICAL MANAGER (3) KRIDL9986697126Running0000782018-01-06T00:00:0000000825-Apr-2018
000005

30-Apr-2018
549201-Oct-2019000216 / 11-Oct-2019 in RTGS10117020One Crore One Lakh Seventeen Thousand Twenty 1432980Fourteen Lakh Thirty Two Thousand Nine Hundred Eighty 8684040Eighty Six Lakh Eighty Four Thousand Fourty
<0>6767183-17-0000312018-01-06T00:00:002018-03-27T00:00:00Asphalting to Bhuvaneshwari Nagar main roads and cross roads and improvements to Road side drains and footpath in ward no 183 Chikkalsandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3181 Developmental Works in Ward no 183, 29, 190, 177, 168, 13, 14, 3, 4, 89, 27, 126 and 132TECHNICAL MANAGER (3) KRIDL9986697126Running0000782018-01-06T00:00:00


Under Process in Asst. Exec. Engineer10117020One Crore One Lakh Seventeen Thousand Twenty 00
<0>6868183-17-0000312018-01-06T00:00:002018-03-27T00:00:00Asphalting to Bhuvaneshwari Nagar main roads and cross roads and improvements to Road side drains and footpath in ward no 183 Chikkalsandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3181 Developmental Works in Ward no 183, 29, 190, 177, 168, 13, 14, 3, 4, 89, 27, 126 and 132TECHNICAL MANAGER (3) KRIDL9986697126Running0000782018-01-06T00:00:00


Under Process in Asst. Exec. Engineer10117020One Crore One Lakh Seventeen Thousand Twenty 00
<0>6969183-17-0000312018-01-06T00:00:002018-03-27T00:00:00Asphalting to Bhuvaneshwari Nagar main roads and cross roads and improvements to Road side drains and footpath in ward no 183 Chikkalsandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP3181 Developmental Works in Ward no 183, 29, 190, 177, 168, 13, 14, 3, 4, 89, 27, 126 and 132TECHNICAL MANAGER (3) KRIDL9986697126Running0000782018-01-06T00:00:00


Under Process in Asst. Exec. Engineer10117020One Crore One Lakh Seventeen Thousand Twenty 00
<0>7070183-16-0000122017-03-31T00:00:002017-10-18T00:00:00Providing missing water supply and UGD Lines Borewells Redoing of excavated portions and other works in ward no 183 Chikkalasandra183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1802 Water Supply New AreasM RAVI BHUSHAN9448295688First and Final0000692017-12-29T00:00:0000004629-Dec-2017
000075

30-Dec-2017
646609-Oct-2018000241 / 16-Oct-2018 in RTGS1773500Seventeen Lakh Seventy Three Thousand Five Hundred 182525One Lakh Eighty Two Thousand Five Hundred Twenty Five1590975Fifteen Lakh Ninety Thousand Nine Hundred Seventy Five
<0>7171183-17-0000102017-09-26T00:00:002017-12-25T00:00:00Patchwork for Pothole and road cutting in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksB C SUKUMAR9663453136First and Final0000342017-09-25T00:00:0000004711-Jan-2018
000080

16-Jan-2018
970808-Feb-2018000392 / 12-Feb-2018 in RTGS1184426Eleven Lakh Eighty Four Thousand Four Hundred Twenty Six170226One Lakh Seventy Thousand Two Hundred Twenty Six1014200Ten Lakh Fourteen Thousand Two Hundred
<0>7272183-17-0000022017-09-13T00:00:002018-07-20T00:00:00Providing Outdoor gym equipments and children play equipments at Vishweshwaraiah park183 ChikkalsandraExecutive Engineer Project - South ZoneP0190 Works sanctioned by Hon MayorEXECUTIVE ENGINEER-39845388800First and Final0000232017-09-15T00:00:0000007201-Dec-2018
000079

01-Jan-2019
000045 / 27-May-2021 in RTGS4898724Fourty Eight Lakh Ninety Eight Thousand Seven Hundred Twenty Four573265Five Lakh Seventy Three Thousand Two Hundred Sixty Five4325459Fourty Three Lakh Twenty Five Thousand Four Hundred Fifty Nine
<0>7373183-17-0000012017-09-13T00:00:002018-04-17T00:00:00Providing Outdoor gym equipments and children play equipments and other developmental works to Bhuvaneshwari park183 ChikkalsandraExecutive Engineer Project - South ZoneP0190 Works sanctioned by Hon MayorTHE TECHNICAL MANAGER-39845388800First and Final0000092017-09-14T00:00:0000006930-Nov-2018
000076

01-Jan-2019
000056 / 02-Jun-2021 in RTGS4894983Fourty Eight Lakh Ninety Four Thousand Nine Hundred Eighty Three572820Five Lakh Seventy Two Thousand Eight Hundred Twenty 4322163Fourty Three Lakh Twenty Two Thousand One Hundred Sixty Three
<0>7474183-17-0000032017-09-14T00:00:002018-06-13T00:00:00Providing outdoor gym equipments and children equipments at KEB Park183 ChikkalsandraExecutive Engineer Project - South ZoneP0190 Works sanctioned by Hon MayorTHE TECHNICAL MANAGER-39845388800First and Final0000082017-09-14T00:00:0000006830-Nov-2018
000074

01-Jan-2019
000045 / 27-May-2021 in RTGS4891602Fourty Eight Lakh Ninety One Thousand Six Hundred Two572445Five Lakh Seventy Two Thousand Four Hundred Fourty Five4319157Fourty Three Lakh Nineteen Thousand One Hundred Fifty Seven
<0>7575183-17-0000042017-08-28T00:00:002018-02-23T00:00:00Construction of Teritiary Storm Water Drain, Remodeling of side drains and concreting of low lying area roads at Hanumagirinagar and Chikkallasandra Ward no 183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0541 Commissioner Discretionary GrantsS SATHISH9901333577Running0000122017-08-28T00:00:0000007922-Dec-2018
000165

29-Dec-2018
000019 / 05-May-2021 in RTGS17077350One Crore Seventy Lakh Seventy Seven Thousand Three Hundred Fifty 1010330Ten Lakh Ten Thousand Three Hundred Thirty 16067020One Crore Sixty Lakh Sixty Seven Thousand Twenty
<0>7676183-17-0000212017-07-11T00:00:002017-11-20T00:00:00Improvements and Construction of drain to 7th, 8th,9th and 13th A Cross roads at Ittamadu in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksB C SUKUMAR9663453136First and Final0000072017-08-16T00:00:0000006124-Feb-2018
000115

27-Feb-2018
389523-Jul-2019000125 / 25-Jul-2019 in RTGS1557190Fifteen Lakh Fifty Seven Thousand One Hundred Ninety 169260One Lakh Sixty Nine Thousand Two Hundred Sixty 1387930Thirteen Lakh Eighty Seven Thousand Nine Hundred Thirty
<0>7777183-16-0000012017-01-27T00:00:002021-01-20T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Final0000352017-07-18T00:00:0000001506-Jul-2021
000010

06-Jul-2021
000246 / 13-Oct-2021 in RTGS142684One Lakh Fourty Two Thousand Six Hundred Eighty Four16126Sixteen Thousand One Hundred Twenty Six126558One Lakh Twenty Six Thousand Five Hundred Fifty Eight
<0>7878183-16-0000012017-01-27T00:00:002020-12-04T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000018321-Dec-2020
000182

21-Dec-2020
463101-Mar-2021000287 / 05-Mar-2021 in RTGS260858Two Lakh Sixty Thousand Eight Hundred Fifty Eight28762Twenty Eight Thousand Seven Hundred Sixty Two232096Two Lakh Thirty Two Thousand Ninety Six
<0>7979183-16-0000012017-01-27T00:00:002020-09-02T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000013101-Oct-2020
000127

01-Oct-2020
304030-Nov-2020000218 / 01-Dec-2020 in RTGS260858Two Lakh Sixty Thousand Eight Hundred Fifty Eight27262Twenty Seven Thousand Two Hundred Sixty Two233596Two Lakh Thirty Three Thousand Five Hundred Ninety Six
<0>8080183-16-0000012017-01-27T00:00:002020-06-01T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000003617-Jun-2020
000036

18-Jun-2020
119725-Jun-2020000103 / 29-Jun-2020 in RTGS521717Five Lakh Twenty One Thousand Seven Hundred Seventeen53322Fifty Three Thousand Three Hundred Twenty Two468395Four Lakh Sixty Eight Thousand Three Hundred Ninety Five
<0>8181183-16-0000012017-01-27T00:00:002019-12-02T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000022421-Dec-2019
000224

21-Dec-2019
891710-Mar-2020000046 / 29-May-2020 in RTGS173906One Lakh Seventy Three Thousand Nine Hundred Six63475Sixty Three Thousand Four Hundred Seventy Five110431One Lakh Ten Thousand Four Hundred Thirty One
<0>8282183-16-0000012017-01-27T00:00:002019-10-04T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000019304-Nov-2019
000194

04-Nov-2019
634222-Nov-2019000278 / 26-Nov-2019 in RTGS260858Two Lakh Sixty Thousand Eight Hundred Fifty Eight20162Twenty Thousand One Hundred Sixty Two240696Two Lakh Fourty Thousand Six Hundred Ninety Six
<0>8383183-16-0000012017-01-27T00:00:002019-07-02T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000007013-Jul-2019
000070

13-Jul-2019
357017-Jul-2019000115 / 18-Jul-2019 in RTGS260858Two Lakh Sixty Thousand Eight Hundred Fifty Eight20462Twenty Thousand Four Hundred Sixty Two240396Two Lakh Fourty Thousand Three Hundred Ninety Six
<0>8484183-16-0000012017-02-01T00:00:002019-04-12T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000001610-May-2019
000017

10-May-2019
318627-Jun-2019000102 / 02-Jul-2019 in RTGS260858Two Lakh Sixty Thousand Eight Hundred Fifty Eight20962Twenty Thousand Nine Hundred Sixty Two239896Two Lakh Thirty Nine Thousand Eight Hundred Ninety Six
<0>8585183-16-0000012017-02-01T00:00:002019-01-02T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000017718-Jan-2019
000179

18-Jan-2019
79923-Apr-2019000029 / 25-Apr-2019 in RTGS434764Four Lakh Thirty Four Thousand Seven Hundred Sixty Four36937Thirty Six Thousand Nine Hundred Thirty Seven397827Three Lakh Ninety Seven Thousand Eight Hundred Twenty Seven
<0>8686183-16-0000012017-01-27T00:00:002018-08-04T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000008015-Sep-2018
000082

17-Sep-2018
43911-Apr-2019000017 / 12-Apr-2019 in RTGS521717Five Lakh Twenty One Thousand Seven Hundred Seventeen47041Fourty Seven Thousand Fourty One474676Four Lakh Seventy Four Thousand Six Hundred Seventy Six
<0>8787183-16-0000012018-03-27T00:00:002018-03-08T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000014026-Mar-2018
000145

26-Mar-2018
431025-Jul-2018000146 / 27-Jul-2018 in RTGS260858Two Lakh Sixty Thousand Eight Hundred Fifty Eight24521Twenty Four Thousand Five Hundred Twenty One236337Two Lakh Thirty Six Thousand Three Hundred Thirty Seven
<0>8888183-16-0000012017-01-27T00:00:002017-12-05T00:00:00Operation and Maintenance of Street Lighting System in Ward No.183 Package S-1A of South Zone183 ChikkalsandraExecutive Engineer Electrical South ZoneP0300 M and R to Street Lights - Replacement of Burnt Bulbs etc. (Package)M/s.Vijayalakshmi Associates (K.S.mohan)0Running0000352017-07-18T00:00:0000004206-Dec-2017
000042

12-Dec-2017
358211-Jul-2018000127 / 18-Jul-2018 in RTGS783889Seven Lakh Eighty Three Thousand Eight Hundred Eighty Nine65857Sixty Five Thousand Eight Hundred Fifty Seven718032Seven Lakh Eighteen Thousand Thirty Two
<0>8989183-17-0000172017-05-25T00:00:002017-08-23T00:00:00Improvements and Construction of drain of 8th, 9th Cross and other roads at Bhuvaneshwari Nagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksK C SREEDHAR PROP OF M/S SONU ENGINEERS9901698462First and Final0000262017-05-25T00:00:0000010215-Feb-2019
000192

15-Feb-2019
000067 / 08-Jun-2021 in RTGS1851400Eighteen Lakh Fifty One Thousand Four Hundred 185820One Lakh Eighty Five Thousand Eight Hundred Twenty 1665580Sixteen Lakh Sixty Five Thousand Five Hundred Eighty
<0>9090183-17-0000182017-05-25T00:00:002017-08-31T00:00:00Improvements and Construction of drain of 12th main and other roads at Bhuvaneshwari Nagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksK C SREEDHAR PROP OF M/S SONU ENGINEERS9901698462First and Final0000272017-05-25T00:00:0000010115-Feb-2019
000191

15-Feb-2019
000067 / 08-Jun-2021 in RTGS1803250Eighteen Lakh Three Thousand Two Hundred Fifty 173610One Lakh Seventy Three Thousand Six Hundred Ten1629640Sixteen Lakh Twenty Nine Thousand Six Hundred Fourty
<0>9191183-17-0000062017-07-01T00:00:002017-10-03T00:00:00Remodeling of side drains of low lying area roads to avoid flood at Kamakya Surrounding area in chikkalasandra in ward no 183. 183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0541 Commissioner Discretionary GrantsK C SRIDHAR Prop of Sonu Engineers9901698462First and Final0000242017-05-20T00:00:0000000417-Apr-2018
000014

23-May-2018
641026-Nov-2019000281 / 27-Nov-2019 in RTGS2791300Twenty Seven Lakh Ninety One Thousand Three Hundred 294185Two Lakh Ninety Four Thousand One Hundred Eighty Five2497115Twenty Four Lakh Ninety Seven Thousand One Hundred Fifteen
<0>9292183-17-0000052017-04-20T00:00:002017-06-30T00:00:00Remodeling of side drains of low laying area roads to avoid flood at kakathiyangar area in chikkalasandra in ward no 183. 183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0541 Commissioner Discretionary GrantsA N NARASIMHAIAH7259223456First and Final0000102017-04-20T00:00:0000000521-Aug-2017
000011

29-Aug-2017
128802-May-2019000037 / 06-May-2019 in RTGS4505680Fourty Five Lakh Five Thousand Six Hundred Eighty 284295Two Lakh Eighty Four Thousand Two Hundred Ninety Five4221385Fourty Two Lakh Twenty One Thousand Three Hundred Eighty Five
<0>9393183-17-0000222017-04-07T00:00:002017-06-09T00:00:00Improvements to drain and Concreting of 3rd Main and Cross roads at Ittamadu in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksSRI GAJANANA CONSTRUCTIONS9448616714First and Final0000042017-04-07T00:00:0000008609-Jun-2017
000098

23-Jun-2017
820621-Dec-2018000321 / 10-Jan-2019 in RTGS1284930Twelve Lakh Eighty Four Thousand Nine Hundred Thirty 188260One Lakh Eighty Eight Thousand Two Hundred Sixty 1096670Ten Lakh Ninety Six Thousand Six Hundred Seventy
<0>9494183-17-0000232017-03-31T00:00:002018-02-27T00:00:00Concreting of 1st and 3rd Cross roads at Bhuvaneshwari Nagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksM/s ACR Projects Prop of Chennareddy A9008899200First and Final0001192017-03-31T00:00:0000005116-Jul-2019
000105

17-Jul-2019
000225 / 05-Oct-2021 in RTGS1835305Eighteen Lakh Thirty Five Thousand Three Hundred Five392195Three Lakh Ninety Two Thousand One Hundred Ninety Five1443110Fourteen Lakh Fourty Three Thousand One Hundred Ten
<0>9595183-17-0000242017-05-08T00:00:002017-06-28T00:00:00Concreting of 4th and 5th Cross roads at Bhuvaneshwari Nagar in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksM/S ACR PROJECTS9008899200First and Final00*1202017-03-31T00:00:0000000417-Aug-2017
000058

16-Nov-2017
215628-May-2019000065 / 30-May-2019 in RTGS1804000Eighteen Lakh Four Thousand 211485Two Lakh Eleven Thousand Four Hundred Eighty Five1592515Fifteen Lakh Ninety Two Thousand Five Hundred Fifteen
<0>9696183-17-0000192017-03-23T00:00:002017-04-28T00:00:00Construction of Drain and Culvert around Sri Gangamma Temple Compound in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksN CHETHAN KUMAR 9902067334First and Final0001142017-03-23T00:00:0000002828-Apr-2017
000032

28-Apr-2017
603401-Oct-2018000230 / 12-Oct-2018 in RTGS1408320Fourteen Lakh Eight Thousand Three Hundred Twenty 115270One Lakh Fifteen Thousand Two Hundred Seventy 1293050Twelve Lakh Ninety Three Thousand Fifty
<0>9797183-17-0000202017-03-23T00:00:002017-04-28T00:00:00Concreting of narrow roads around Sri Gangamma Temple in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksN CHETHAN KUMAR9902067334First and Final0001132017-03-23T00:00:0000002728-Apr-2017
000031

28-Apr-2017
603301-Oct-2018000230 / 12-Oct-2018 in RTGS1425560Fourteen Lakh Twenty Five Thousand Five Hundred Sixty 121945One Lakh Twenty One Thousand Nine Hundred Fourty Five1303615Thirteen Lakh Three Thousand Six Hundred Fifteen
<0>9898183-17-0000122017-03-03T00:00:002018-06-23T00:00:00Depot collection in ward no-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N NARASIMHAIAH7259223456First and Final0000882017-03-03T00:00:0000003425-Jul-2018
000061

27-Jul-2018
43428-May-2020000061 / 05-Jun-2020 in RTGS589800Five Lakh Eighty Nine Thousand Eight Hundred 84765Eighty Four Thousand Seven Hundred Sixty Five505035Five Lakh Five Thousand Thirty Five
<0>9999183-17-0000162017-04-06T00:00:002017-06-30T00:00:00Improvements to drain, Kerbs and replacing of broken covering slabs in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N NARASIMHAIAH7259223456First and Final0000892017-03-03T00:00:0000000621-Aug-2017
000012

29-Aug-2017
128902-May-2019000037 / 06-May-2019 in RTGS390100Three Lakh Ninety Thousand One Hundred 24325Twenty Four Thousand Three Hundred Twenty Five365775Three Lakh Sixty Five Thousand Seven Hundred Seventy Five
<0>100100183-17-0000042018-02-28T00:00:002018-03-09T00:00:00Preparation of Detailed project report for the work of Construction of Teritiary Storm Water Drain, Remodeling of side drains and concreting of low lying area roads at Hanumagirinagar and Chikkallasandra Ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0541 Commissioner Discretionary GrantsSRI MALAGONDA BASAGONDA NAIK PROP B V H CONSUTTING ENGINEERS9964339888Running0000582017-02-28T00:00:0000003111-Jul-2018
000058

20-Jul-2018
772518-Jan-2020000356 / 18-Jan-2020 in RTGS206000Two Lakh Six Thousand 20600Twenty Thousand Six Hundred 185400One Lakh Eighty Five Thousand Four Hundred
<0>101101183-16-0000032017-01-13T00:00:002017-04-06T00:00:00Patchwork for Pothole and road cutting in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksB C MANJESH9686600998First and Final0000462017-01-13T00:00:0000001827-Apr-2017
000046

15-May-2017
422824-Jul-2018000142 / 26-Jul-2018 in RTGS958750Nine Lakh Fifty Eight Thousand Seven Hundred Fifty 150295One Lakh Fifty Thousand Two Hundred Ninety Five808455Eight Lakh Eight Thousand Four Hundred Fifty Five
<0>102102183-16-0000072016-07-05T00:00:002016-10-28T00:00:00Improvements drain Reconstructions of culvert in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksT G SURAJ9449854057First and Final0000232016-07-01T00:00:0000018614-Dec-2016
000341

16-Dec-2016
339207-Jul-2018000117 / 09-Jul-2018 in RTGS233530Two Lakh Thirty Three Thousand Five Hundred Thirty 33375Thirty Three Thousand Three Hundred Seventy Five200155Two Lakh One Hundred Fifty Five
<0>103103183-16-0000022016-02-05T00:00:002017-01-09T00:00:00Ward Area Maintenance in Ward no-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksSRI LAKSHMI RANGANAT9964218400First and Final0000822016-06-04T00:00:0000006621-Aug-2019
000131

22-Aug-2019
000322 / 01-Feb-2022 in RTGS1191370Eleven Lakh Ninety One Thousand Three Hundred Seventy 105920One Lakh Five Thousand Nine Hundred Twenty 1085450Ten Lakh Eighty Five Thousand Four Hundred Fifty
<0>104104183-16-0000082017-01-30T00:00:002017-03-20T00:00:00Concreting of narrow roads 13th cross 2nd C and D Cross roads at Kuvempunagar Ittamadu in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksH N MANJEGOWDA9448174223First and Final0000082016-04-18T00:00:0000000804-Apr-2017
000002

05-Apr-2017
584720-Sep-2018000217 / 27-Sep-2018 in RTGS1675280Sixteen Lakh Seventy Five Thousand Two Hundred Eighty 237485Two Lakh Thirty Seven Thousand Four Hundred Eighty Five1437795Fourteen Lakh Thirty Seven Thousand Seven Hundred Ninety Five
<0>105105183-16-0000132017-01-20T00:00:002017-03-20T00:00:00Concreting of narrow roads 11th 12th and 2nd B cross roads at Kuvempunagar in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksH N MANJEGOWDA9448174223Final0000072016-04-18T00:00:0000024531-Mar-2017
000001

03-Apr-2017
584620-Sep-2018000217 / 27-Sep-2018 in RTGS1913430Nineteen Lakh Thirteen Thousand Four Hundred Thirty 260585Two Lakh Sixty Thousand Five Hundred Eighty Five1652845Sixteen Lakh Fifty Two Thousand Eight Hundred Fourty Five
<0>106106183-16-0000102018-01-04T00:00:002018-03-27T00:00:00Concreting to 2nd D Road at ittumadu in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksR CHANDRA PROP OF R C ENTERPRISES9880212349First and Final0000032016-04-04T00:00:0000002119-Jun-2018
000032

27-Jun-2018
746616-Jan-2020000348 / 16-Jan-2020 in RTGS561395Five Lakh Sixty One Thousand Three Hundred Ninety Five71185Seventy One Thousand One Hundred Eighty Five490210Four Lakh Ninety Thousand Two Hundred Ten
<0>107107183-16-0000092016-04-04T00:00:002016-04-28T00:00:00Concreting of 10th cross road at kuvempunagar Ittamadu in ward no 183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksR CHANDRA9880212349First and Final0000022016-04-04T00:00:00000 2030-Apr-2016
000025

30-Apr-2016
767610-Nov-2017000290 / 17-Nov-2017 in RTGS560050Five Lakh Sixty Thousand Fifty 79520Seventy Nine Thousand Five Hundred Twenty 480530Four Lakh Eighty Thousand Five Hundred Thirty
<0>108108183-16-0000112016-04-04T00:00:002016-04-28T00:00:00Construction of drain and Concreting of road to 6th main at Sriramanagar in ward no 183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksR CHANDRA9880212349First and Final0000012016-04-04T00:00:0000001930-Apr-2016
000024

30-Apr-2016
762809-Nov-2017000290 / 17-Nov-2017 in RTGS937720Nine Lakh Thirty Seven Thousand Seven Hundred Twenty 133020One Lakh Thirty Three Thousand Twenty 804700Eight Lakh Four Thousand Seven Hundred
<0>109109183-16-0000042016-09-22T00:00:002016-11-13T00:00:00Emergency Works and providing Name Boards in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW Works DILEEP K C9880472333First and Final0001102016-02-29T00:00:0000006224-Feb-2018
000156

02-Mar-2018
491203-Sep-2019000190 / 17-Sep-2019 in RTGS114250One Lakh Fourteen Thousand Two Hundred Fifty 29285Twenty Nine Thousand Two Hundred Eighty Five84965Eighty Four Thousand Nine Hundred Sixty Five
<0>110110183-16-0000052016-02-04T00:00:002017-01-29T00:00:00Depot collection in ward no-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N NARASIMHAIAH7259223456First and Final0000752016-02-04T00:00:0000003003-May-2017
000037

15-May-2017
423624-Jul-2018000142 / 26-Jul-2018 in RTGS593580Five Lakh Ninety Three Thousand Five Hundred Eighty 103870One Lakh Three Thousand Eight Hundred Seventy 489710Four Lakh Eighty Nine Thousand Seven Hundred Ten
<0>111111183-16-0000062016-02-04T00:00:002017-01-28T00:00:00Improvements drain, kerbs and replacing of broken covering slabs in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N NARASIMHAIAH7259223456Second and Final0000742016-02-04T00:00:0000003206-May-2017
000038

15-May-2017
675316-Oct-2018000255 / 30-Oct-2018 in RTGS457413Four Lakh Fifty Seven Thousand Four Hundred Thirteen58385Fifty Eight Thousand Three Hundred Eighty Five399028Three Lakh Ninety Nine Thousand Twenty Eight
<0>112112183-16-0000062016-04-04T00:00:002016-09-12T00:00:00Improvements drain, kerbs and replacing of broken covering slabs in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N NARASIMHAIAH7259223456Running0000742016-02-04T00:00:0000002903-May-2017
000042

15-May-2017
675416-Oct-2018000255 / 30-Oct-2018 in RTGS127214One Lakh Twenty Seven Thousand Two Hundred Fourteen16665Sixteen Thousand Six Hundred Sixty Five110549One Lakh Ten Thousand Five Hundred Fourty Nine
<0>113113183-15-0000192015-04-20T00:00:002015-08-05T00:00:00Improvements and providing chiuldren play equipments and providing tiles to pathway at Bhuvaneshwarinagar park providing benches and repairs to fencing at Kuvempu and KEB park in Chikkalasandra ward no 183 Padmanabhanagar Constituency183 ChikkalsandraExecutive Engineer Project - South ZoneP0190 Works sanctioned by Hon MayorTechnical Manager9448021479First and Final0000402015-04-20T00:00:00181/1510-Dec-2015
481/15-

15-Dec-2015
482116-Aug-2017000191 / 22-Aug-2017 in RTGS2997240Twenty Nine Lakh Ninety Seven Thousand Two Hundred Fourty 452605Four Lakh Fifty Two Thousand Six Hundred Five2544635Twenty Five Lakh Fourty Four Thousand Six Hundred Thirty Five
<0>114114183-15-0000092015-05-06T00:00:002015-06-18T00:00:00Construction of culverts and drain in 7th Cross and 3rd Main Road of Ittamadu in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHarish L9743655524First and Final0000022015-04-07T00:00:0000003221-Jun-2015
000071

29-Jun-2015
157715-May-2017000056 / 18-May-2017 in RTGS419336Four Lakh Nineteen Thousand Three Hundred Thirty Six54536Fifty Four Thousand Five Hundred Thirty Six364800Three Lakh Sixty Four Thousand Eight Hundred
<0>115115183-13-0000192014-02-03T00:00:002014-02-22T00:00:00Providing 250Watts SV fittings Control wire Control switches Park lightings in ward 183183 ChikkalsandraExecutive Engineer Electrical South ZoneP1828 Provision of Additional Fittings StreetlightsM/s.B.K.Associates9886197871First and Final0001162015-04-01T00:00:00125/1322-Feb-2014
292/13

22-Feb-2014
478509-Jan-2016002291 / 22-Jan-2016 in RTGS48144Fourty Eight Thousand One Hundred Fourty Four7029Seven Thousand Twenty Nine41115Fourty One Thousand One Hundred Fifteen
<0>116116183-15-0000202015-03-04T00:00:002015-05-28T00:00:00Resurfacing to roads of W S of Bhuvaneshwarinagar Park 5th block BSK 3rd stage in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0190 Works sanctioned by Hon MayorTechnical Manager (3)9986697126First and Final0001792015-03-03T00:00:0000000528-May-2015
000028

25-Jun-2015
267006-Jun-2017000090 / 07-Jun-2017 in RTGS4447130Fourty Four Lakh Fourty Seven Thousand One Hundred Thirty 746140Seven Lakh Fourty Six Thousand One Hundred Fourty 3700990Thirty Seven Lakh Nine Hundred Ninety
<0>117117183-13-0000172015-01-19T00:00:002015-04-20T00:00:00Resurfacing to roads of Bhuvaneshwarinagar Rangappa layout in ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP2201 Assembly Constituency Development Works under BBMPKRIDL9986697126First and Final0001402015-01-20T00:00:0000000420-May-2015
000030

25-Jun-2015
266506-Jun-2017000090 / 07-Jun-2017 in RTGS4569360Fourty Five Lakh Sixty Nine Thousand Three Hundred Sixty 760360Seven Lakh Sixty Thousand Three Hundred Sixty 3809000Thirty Eight Lakh Nine Thousand
<0>118118183-15-0000052015-01-09T00:00:002015-02-25T00:00:00Improvements to Drain and Providing B.S covering slabs to 7th A Cross road Between 7th to 8th Cross of Bhuvaneshwarinagar in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHARISH N 9740808031Final0001272015-01-07T00:00:0000007826-Feb-2015
000473

28-Feb-2015
783501-Mar-2017000207 / 06-Mar-2017 in RTGS614970Six Lakh Fourteen Thousand Nine Hundred Seventy 79560Seventy Nine Thousand Five Hundred Sixty 535410Five Lakh Thirty Five Thousand Four Hundred Ten
<0>119119183-15-0000062015-01-09T00:00:002015-03-25T00:00:00Improvements to Drain and Providing B S covering slabs to 7th B Cross road Between 7th to 8th Cross of Bhuvaneshwarinagar in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHARISH N 9740808031Final0001262015-01-07T00:00:0000047428-Feb-2015
000474

28-Feb-2015
783601-Mar-2017000207 / 06-Mar-2017 in RTGS806525Eight Lakh Six Thousand Five Hundred Twenty Five110095One Lakh Ten Thousand Ninety Five696430Six Lakh Ninety Six Thousand Four Hundred Thirty
<0>120120183-15-0000182015-01-06T00:00:002015-06-18T00:00:00Patchwork for Pothole and road cutting in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksS SATISH9901333577Final0001182015-01-06T00:00:0000012628-Oct-2015
000247

25-Nov-2015
390822-Jul-2016000087 / 29-Jul-2016 in RTGS936890Nine Lakh Thirty Six Thousand Eight Hundred Ninety 119350One Lakh Nineteen Thousand Three Hundred Fifty 817540Eight Lakh Seventeen Thousand Five Hundred Fourty
<0>121121183-15-0000032015-01-06T00:00:002015-03-17T00:00:00Improvements to Drain and Providing B.S covering slabs to 10th A and 10th B cross road of Omshakthinagar Ittamadu in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksSAI CONSTRUCTIONS 8548050717Final0001132015-01-06T00:00:0000008317-Mar-2015
000480

20-Mar-2015
819713-Mar-2017000216 / 16-Mar-2017 in RTGS1520275Fifteen Lakh Twenty Thousand Two Hundred Seventy Five204795Two Lakh Four Thousand Seven Hundred Ninety Five1315480Thirteen Lakh Fifteen Thousand Four Hundred Eighty
<0>122122183-15-0000122015-01-06T00:00:002015-12-30T00:00:00Maintenance of Special Gangmen in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N Narasimhaiah9742773817First and Final0001042015-01-05T00:00:0000000215-Apr-2016
000101

18-Jun-2016
384812-Jul-2017000142 / 15-Jul-2017 in RTGS431620Four Lakh Thirty One Thousand Six Hundred Twenty 48105Fourty Eight Thousand One Hundred Five383515Three Lakh Eighty Three Thousand Five Hundred Fifteen
<0>123123183-15-0000142015-01-06T00:00:002015-12-30T00:00:00Depot collection in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N Narasimhaiah9742773817First and Final0001062015-01-05T00:00:0000002830-Apr-2016
000102

18-Jun-2016
384912-Jul-2017000142 / 15-Jul-2017 in RTGS378920Three Lakh Seventy Eight Thousand Nine Hundred Twenty 67355Sixty Seven Thousand Three Hundred Fifty Five311565Three Lakh Eleven Thousand Five Hundred Sixty Five
<0>124124183-15-0000152015-03-02T00:00:002016-02-29T00:00:00Ward Area Maintenance In Ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N NARASIMHAIAH 9742773817First and Final0001052015-01-05T00:00:0000000115-Apr-2016
000100

18-Jun-2016
817427-Nov-2017000309 / 29-Nov-2017 in RTGS1181935Eleven Lakh Eighty One Thousand Nine Hundred Thirty Five143120One Lakh Fourty Three Thousand One Hundred Twenty 1038815Ten Lakh Thirty Eight Thousand Eight Hundred Fifteen
<0>125125183-15-0000102015-01-07T00:00:002015-04-01T00:00:00Improvements to Drain and Providing covering slabs to 4th Cross and 5th Main road at Melmarthur/omshakthi Temple of Hanumagirinagar in Ward No183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksKrishna C9740377357First and Final0001122015-01-05T00:00:0000004603-Jul-2015
000117

25-Jul-2015
265606-Jun-2017000090 / 07-Jun-2017 in RTGS1625505Sixteen Lakh Twenty Five Thousand Five Hundred Five213805Two Lakh Thirteen Thousand Eight Hundred Five1411700Fourteen Lakh Eleven Thousand Seven Hundred
<0>126126183-14-0000242015-11-07T00:00:002015-02-20T00:00:00Providing asphalting to Kamakya Main road to Chikkalasandra 1st cross in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0190 Works sanctioned by Hon MayorTechnical Manager (3) 9986697126First and Final0000332014-11-05T00:00:0000000220-May-2015
000027

25-Jun-2015
291212-Jun-2017000100 / 14-Jun-2017 in RTGS2253090Twenty Two Lakh Fifty Three Thousand Ninety 388630Three Lakh Eighty Eight Thousand Six Hundred Thirty 1864460Eighteen Lakh Sixty Four Thousand Four Hundred Sixty
<0>127127183-14-0000272014-11-05T00:00:002015-02-20T00:00:00Providing Asphalting to 2nd main 3rd main 5th main road and 3rd, 4th 5th 6th cross of Kakathiyanagar in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0190 Works sanctioned by Hon MayorTechnical Manager (3)9986697126First and Final0000372014-11-05T00:00:0000000320-May-2015
000029

25-Jun-2015
266406-Jun-2017000090 / 07-Jun-2017 in RTGS2445790Twenty Four Lakh Fourty Five Thousand Seven Hundred Ninety 400930Four Lakh Nine Hundred Thirty 2044860Twenty Lakh Fourty Four Thousand Eight Hundred Sixty
<0>128128183-14-0000262014-11-07T00:00:002015-01-30T00:00:00Construction of Culverts and Improvements to drains with providing covering slabs to Kakathi Nagara 2nd main 3rd main 5th main and 3rd to 6th cross in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0190 Works sanctioned by Hon MayorTECHNICAL MANAGER (3) KRIDL9986697126Final0000362014-11-05T00:00:0000006830-Jan-2015
000468

27-Feb-2015
768125-Feb-2017000200 / 28-Feb-2017 in RTGS7801200Seventy Eight Lakh One Thousand Two Hundred 1243530Twelve Lakh Fourty Three Thousand Five Hundred Thirty 6557670Sixty Five Lakh Fifty Seven Thousand Six Hundred Seventy
<0>129129183-14-0000232014-11-05T00:00:002014-12-31T00:00:00Providing Cement Concrete roads to conservancy roads and bad stretches in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0190 Works sanctioned by Hon MayorTECHNICAL MANAGER (3) KRIDL9986697126Final0000342014-11-05T00:00:0000006223-Jan-2015
000415

31-Jan-2015
728215-Feb-2017000190 / 17-Feb-2017 in RTGS1679920Sixteen Lakh Seventy Nine Thousand Nine Hundred Twenty 285097Two Lakh Eighty Five Thousand Ninety Seven1394823Thirteen Lakh Ninety Four Thousand Eight Hundred Twenty Three
<0>130130183-14-0000252014-11-05T00:00:002014-12-31T00:00:00Removing resetting and Desilting to Kamakya main road (1st Cross Kamakya Layout) in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP0190 Works sanctioned by Hon MayorTECHNICAL MANAGER (3) KRIDL9986697126Final0000352014-11-05T00:00:0000006323-Jan-2015
000416

31-Jan-2015
318823-Jun-2016000070 / 02-Jul-2016 in RTGS986649Nine Lakh Eighty Six Thousand Six Hundred Fourty Nine157409One Lakh Fifty Seven Thousand Four Hundred Nine829240Eight Lakh Twenty Nine Thousand Two Hundred Fourty
<0>131131183-14-0000172014-09-08T00:00:002014-12-01T00:00:00Emergency repairs to Drains Culverts Shoulder drains and Supplying of Materials etc in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksTechnical Manager 39986697126Final0000282014-09-02T00:00:0000004303-Jul-2015
000120

27-Jul-2015
198522-May-2017000066 / 23-May-2017 in RTGS394715Three Lakh Ninety Four Thousand Seven Hundred Fifteen64850Sixty Four Thousand Eight Hundred Fifty 329865Three Lakh Twenty Nine Thousand Eight Hundred Sixty Five
<0>132132183-14-0000162014-09-02T00:00:002014-12-10T00:00:00Emergency Work in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksTECHNICAL MANAGER (3) KRIDL9986697126Final0000292014-09-02T00:00:0000006423-Mar-2015
000414

31-Jan-2015
753121-Feb-2017000195 / 22-Feb-2017 in RTGS1236560Twelve Lakh Thirty Six Thousand Five Hundred Sixty 204030Two Lakh Four Thousand Thirty 1032530Ten Lakh Thirty Two Thousand Five Hundred Thirty
<0>133133183-14-0000062014-06-26T00:00:002014-07-30T00:00:00Improvements to Drain and Providing BS covering slabs to 1st main road from 5th to 3rd cross of Bhuvaneshwarinagar in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksR. Chandra, (R.C. Enterprises)9880212349Final0000112014-06-25T00:00:0000002230-Jul-2014
000179

31-Jul-2014
271117-Jun-2016000066 / 23-Jun-2016 in RTGS1627100Sixteen Lakh Twenty Seven Thousand One Hundred 244015Two Lakh Fourty Four Thousand Fifteen1383085Thirteen Lakh Eighty Three Thousand Eighty Five
<0>134134183-14-0000222014-03-04T00:00:002014-07-31T00:00:00Providing street lights Control switches and pathway sound system and lightings, to Chikkalasandra ward sourrounding area in ward no 183183 ChikkalsandraExecutive Engineer Electrical South ZoneP0190 Works sanctioned by Hon MayorM/s.KRIDL8749058286Second and Final0001562014-03-04T00:00:00039/1431-Jul-2014
151/14

31-Jul-2014
663929-Mar-2016000010 / 26-Apr-2016 in RTGS1381327Thirteen Lakh Eighty One Thousand Three Hundred Twenty Seven183340One Lakh Eighty Three Thousand Three Hundred Fourty 1197987Eleven Lakh Ninety Seven Thousand Nine Hundred Eighty Seven
<0>135135183-14-0000222014-03-04T00:00:002014-06-30T00:00:00Providing street lights Control switches and pathway sound system and lightings, to Chikkalasandra ward sourrounding area in ward no 183183 ChikkalsandraExecutive Engineer Electrical South ZoneP0190 Works sanctioned by Hon MayorM/s.KRIDL8749058286Running0001562014-03-04T00:00:00031/1430-Jun-2014
126/14

30-Jun-2014
663829-Mar-2016000010 / 26-Apr-2016 in RTGS1572951Fifteen Lakh Seventy Two Thousand Nine Hundred Fifty One208776Two Lakh Eight Thousand Seven Hundred Seventy Six1364175Thirteen Lakh Sixty Four Thousand One Hundred Seventy Five
<0>136136183-14-0000052014-03-06T00:00:002014-05-26T00:00:00Improvements to Drain and Providing BS covering slabs to 1st A main roadFrom Kamakya Main road to 2nd cross Bhuvaneshwarinagar in Ward No183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHARISH CONSTRUCTIONS 9448068702Final0003142014-03-04T00:00:0000000831-May-2014
000100

31-May-2014
142322-May-2016000037 / 27-May-2016 in RTGS1157290Eleven Lakh Fifty Seven Thousand Two Hundred Ninety 171300One Lakh Seventy One Thousand Three Hundred 985990Nine Lakh Eighty Five Thousand Nine Hundred Ninety
<0>137137183-14-0000152014-03-01T00:00:002015-03-01T00:00:00Engaging Men and Materials for removal of Debris and Cleaning of Drains in Ward No-183 Jan 2014 to Dec 2014183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N NARASIMHAIAH9742779817Final0003092014-02-28T00:00:0000008517-Mar-2015
000507

30-Mar-2015
284620-Jun-2016000067 / 23-Jun-2016 in RTGS1245795Twelve Lakh Fourty Five Thousand Seven Hundred Ninety Five150285One Lakh Fifty Thousand Two Hundred Eighty Five1095510Ten Lakh Ninety Five Thousand Five Hundred Ten
<0>138138183-14-0000092014-02-20T00:00:002014-05-12T00:00:00Improvements to Drain and Providing BS covering slabs to 2nd C Cross road and cross road at 9th Cross of Ittamadu in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksC R RAVI9535326585Final0002812014-02-18T00:00:0000000712-May-2014
000074

26-May-2014
169828-May-2016000045 / 04-Jun-2016 in RTGS1621420Sixteen Lakh Twenty One Thousand Four Hundred Twenty 222765Two Lakh Twenty Two Thousand Seven Hundred Sixty Five1398655Thirteen Lakh Ninety Eight Thousand Six Hundred Fifty Five
<0>139139183-14-0000072014-02-20T00:00:002014-06-05T00:00:00Improvements to Drain and Providing B S covering slabs to 5th and 4th A Cross road of Ittamadu in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksN.Shivalingegowda9341228174Final0002692014-02-04T00:00:0000002530-Jul-2014
000199

31-Jul-2014
275718-Jun-2016000066 / 23-Jun-2016 in RTGS1829870Eighteen Lakh Twenty Nine Thousand Eight Hundred Seventy 261285Two Lakh Sixty One Thousand Two Hundred Eighty Five1568585Fifteen Lakh Sixty Eight Thousand Five Hundred Eighty Five
<0>140140183-14-0000112014-02-05T00:00:002014-03-26T00:00:00Improvements to Drain and Providing B.S covering slabs to 6th Cross Bata Showroom Road of Bhuvaneshwarinagar in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksSAI CONSTRUCTIONS8548050717Final0002612014-02-03T00:00:0000007126-Mar-2014
000483

27-Mar-2014
464405-Jan-2016002182 / 19-Jan-2016 in RTGS1179560Eleven Lakh Seventy Nine Thousand Five Hundred Sixty 174330One Lakh Seventy Four Thousand Three Hundred Thirty 1005230Ten Lakh Five Thousand Two Hundred Thirty
<0>141141183-11-0000562014-01-01T00:00:002015-07-30T00:00:00PROVIDING PATHWAY AND FENCING TO DENA BANK COLONY PARK IN WARD-183183 ChikkalsandraExecutive Engineer Project - South ZoneP0311 Landscape Development Of Parks/Medians/Boulevants and Circles(Janoodya Works)Sri. M.V. Manjunath9035796609First and Final0000482014-01-30T00:00:00079/1531-Jul-2015
232/15

31-Jul-2015
590427-Feb-2016003102 / 19-Mar-2016 in RTGS926740Nine Lakh Twenty Six Thousand Seven Hundred Fourty 114750One Lakh Fourteen Thousand Seven Hundred Fifty 811990Eight Lakh Eleven Thousand Nine Hundred Ninety
<0>142142183-14-0000082014-01-31T00:00:002014-03-29T00:00:00Improvements to Drain and Providing B S covering slabs to 2nd B Cross road and Cross roads at 9th Cross of Ittamadu in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHarish constructions9448068702Final0002512014-01-28T00:00:0000007529-Mar-2014
000496

29-Mar-2014
404725-Nov-2015001557 / 16-Dec-2015 in RTGS1777375Seventeen Lakh Seventy Seven Thousand Three Hundred Seventy Five269385Two Lakh Sixty Nine Thousand Three Hundred Eighty Five1507990Fifteen Lakh Seven Thousand Nine Hundred Ninety
<0>143143183-13-0000022014-01-27T00:00:002014-04-23T00:00:00Amount Reserved for Emergency works in Ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksDASHARATHARAMIREDDY K9449087857First and Final0002492014-01-27T00:00:0000016418-Jan-2016
000340

25-Jan-2016
551906-Sep-2017000210 / 07-Sep-2017 in RTGS1851560Eighteen Lakh Fifty One Thousand Five Hundred Sixty 261425Two Lakh Sixty One Thousand Four Hundred Twenty Five1590135Fifteen Lakh Ninety Thousand One Hundred Thirty Five
<0>144144183-14-0000012014-02-20T00:00:002014-07-21T00:00:00Providing RCC drain with covering slabs to Eastern Side of Ittamadu Main road (from 100 ft ring road to 7th cross of Ittamadu) in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP2434 Development works for Bangalore CityTECHNICAL MANAGER (3) KRIDL9986697126First and Final0002452014-01-21T00:00:0000003128-Aug-2014
000232

30-Aug-2014
350630-Jun-2016000078 / 12-Jul-2016 in RTGS4528345Fourty Five Lakh Twenty Eight Thousand Three Hundred Fourty Five1839012Eighteen Lakh Thirty Nine Thousand Twelve2689333Twenty Six Lakh Eighty Nine Thousand Three Hundred Thirty Three
<0>145145183-14-0000022014-03-07T00:00:002014-05-29T00:00:00Providing RCC drain with covering slabs to Eastern Side of Ittamadu Main road (from 7th to 4th A Cross Ittamadu ) and Northern Side of 7th cross Ittamadu in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP2434 Development works for Bangalore CityTECHNICAL MANAGER (3) KRIDL9986697126First and Final00 2462014-01-21T00:00:0000001131-May-2014
000112

31-May-2014
143222-May-2016000037 / 27-May-2016 in RTGS3928175Thirty Nine Lakh Twenty Eight Thousand One Hundred Seventy Five1663875Sixteen Lakh Sixty Three Thousand Eight Hundred Seventy Five2264300Twenty Two Lakh Sixty Four Thousand Three Hundred
<0>146146183-14-0000032014-01-23T00:00:002014-04-25T00:00:00Improvements to Drain and Providing B.S Covering Slabs to Eastern Side of Ittamadu Main road (from 4th A Cross to SWD ) in Ward No-183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP2434 Development works for Bangalore CityTECHNICAL MANAGER (3)9986697126Final0002472014-01-21T00:00:0000000526-Apr-2014
000048

30-Apr-2014
66629-Apr-2016000020 / 06-May-2016 in RTGS3282266Thirty Two Lakh Eighty Two Thousand Two Hundred Sixty Six1359466Thirteen Lakh Fifty Nine Thousand Four Hundred Sixty Six1922800Nineteen Lakh Twenty Two Thousand Eight Hundred
<0>147147183-14-0000042013-12-28T00:00:002014-02-28T00:00:00Improvements to Drain and Providing BS covering slabs to 5th and 6th main roadBetween Kamakya Main road to 1st cross Chikkalasandra in Ward No183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksN SHIVALINGEGOWDA9341228174Final0002032013-12-27T00:00:0000006328-Feb-2014
000453

28-Feb-2014
387119-Nov-2015001425 / 15-Dec-2015 in RTGS1859159Eighteen Lakh Fifty Nine Thousand One Hundred Fifty Nine261823Two Lakh Sixty One Thousand Eight Hundred Twenty Three1597336Fifteen Lakh Ninety Seven Thousand Three Hundred Thirty Six
<0>148148183-14-0000142013-12-31T00:00:002015-01-30T00:00:00Depot collection in ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW Workstechnical manager 9986697126Final0001882013-12-20T00:00:0000006930-Jan-2015
000475

28-Feb-2015
284420-Jun-2016000067 / 23-Jun-2016 in RTGS614900Six Lakh Fourteen Thousand Nine Hundred 97110Ninety Seven Thousand One Hundred Ten517790Five Lakh Seventeen Thousand Seven Hundred Ninety
<0>149149183-14-0000182013-12-20T00:00:002014-11-17T00:00:00Patchwork for Pothole and road cutting in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksTECHNICAL MANAGER (3) KRIDL9986697126Final0001912013-12-20T00:00:0000004117-Nov-2014
000320

28-Nov-2014
649809-Jan-2017000174 / 21-Jan-2017 in RTGS1099640Ten Lakh Ninety Nine Thousand Six Hundred Fourty 198975One Lakh Ninety Eight Thousand Nine Hundred Seventy Five900665Nine Lakh Six Hundred Sixty Five
<0>150150183-14-0000132013-12-20T00:00:002014-03-29T00:00:00Improvements to Drain and Providing B S covering slabs to 2nd Cross road 5th Block of Bhuvaneshwarinagar in Ward No 183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksN Shivalingegowda9341228174Final0002022013-12-20T00:00:0000007729-Mar-2014
000493

29-Mar-2014
387019-Nov-2015001424 / 15-Dec-2015 in RTGS1113760Eleven Lakh Thirteen Thousand Seven Hundred Sixty 148567One Lakh Fourty Eight Thousand Five Hundred Sixty Seven965193Nine Lakh Sixty Five Thousand One Hundred Ninety Three
<0>151151183-14-0000102013-12-20T00:00:002014-03-29T00:00:00Improvements to Drain and Providing BS covering slabs to Western side of 7th Main road Syndicate Bank Colony in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksK S PRAMODH9845255858Final0001642013-12-16T00:00:0000008029-Mar-2014
000503

29-Mar-2014
369909-Oct-2015001133 / 17-Oct-2015 in RTGS842215Eight Lakh Fourty Two Thousand Two Hundred Fifteen115720One Lakh Fifteen Thousand Seven Hundred Twenty 726495Seven Lakh Twenty Six Thousand Four Hundred Ninety Five
<0>152152183-14-0000122013-12-17T00:00:002014-02-28T00:00:00Improvements to Drain and Providing B S covering slabs to 3rd MainFrom Kamakya main road to Chikkalasandra 1st Cross in Ward No 183.183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksK RAMESH9986076775Final0001632013-12-16T00:00:0000006228-Feb-2014
000452

28-Feb-2014
386919-Nov-2015001423 / 15-Dec-2015 in RTGS1167640Eleven Lakh Sixty Seven Thousand Six Hundred Fourty 164605One Lakh Sixty Four Thousand Six Hundred Five1003035Ten Lakh Three Thousand Thirty Five
<0>153153183-14-0000192013-12-16T00:00:002014-12-19T00:00:00Maintenance of ward Special Gangmen in Ward No 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksK S SRINIVASAN9448085873Final0001512013-12-13T00:00:0000004919-Dec-2014
000403

28-Jan-2015
670030-Mar-2016000014 / 29-Apr-2016 in RTGS624575Six Lakh Twenty Four Thousand Five Hundred Seventy Five47225Fourty Seven Thousand Two Hundred Twenty Five577350Five Lakh Seventy Seven Thousand Three Hundred Fifty
<0>154154183-13-0000132013-12-09T00:00:002014-03-26T00:00:00Improvements to drains Providing Covering slabs and Cement Concreting to 9th A cross roads at Chowdeshwari School of Omshakthinagar in Ward no. 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksH N MANJEGOWDA9448174223Final0001412013-12-07T00:00:0000007226-Mar-2014
000482

27-Mar-2014
383418-Nov-2015001399 / 15-Dec-2015 in RTGS1099175Ten Lakh Ninety Nine Thousand One Hundred Seventy Five161740One Lakh Sixty One Thousand Seven Hundred Fourty 937435Nine Lakh Thirty Seven Thousand Four Hundred Thirty Five
<0>155155183-13-0000122013-11-06T00:00:002013-12-25T00:00:00Improvements to drains and Providing Covering slabs to 8th 8th A 8th B cross road of Ittamadu in Ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHarish Constructions9448068702Final0001192013-11-06T00:00:0000004828-Dec-2013
000347

28-Dec-2013
386319-Nov-2015001419 / 15-Dec-2015 in RTGS1680045Sixteen Lakh Eighty Thousand Fourty Five255995Two Lakh Fifty Five Thousand Nine Hundred Ninety Five1424050Fourteen Lakh Twenty Four Thousand Fifty
<0>156156183-11-0000492013-10-28T00:00:002014-11-28T00:00:00Construction of Ward office building in Ward No-183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksA N NARASIMHAIAH9742773817Final00 1002013-10-23T00:00:0000004428-Nov-2014
000312

28-Nov-2014
27619-Apr-2016000014 / 29-Apr-2016 in RTGS3206900Thirty Two Lakh Six Thousand Nine Hundred 434355Four Lakh Thirty Four Thousand Three Hundred Fifty Five2772545Twenty Seven Lakh Seventy Two Thousand Five Hundred Fourty Five
<0>157157183-12-0000112013-10-25T00:00:002014-01-27T00:00:00Improvements to drain and providing covering slabs to 13th cross of Kuvempunagar ittamadu in ward no. 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP2201 Assembly Constituency Development Works under BBMPA N NARASIMHAIAH9742773817Final0000992013-10-23T00:00:0000000931-May-2014
000098

31-May-2014
142222-May-2016000037 / 27-May-2016 in RTGS1130105Eleven Lakh Thirty Thousand One Hundred Five160935One Lakh Sixty Thousand Nine Hundred Thirty Five969170Nine Lakh Sixty Nine Thousand One Hundred Seventy
<0>158158183-13-0000092013-08-03T00:00:002013-09-28T00:00:00Improvements to drains and Providing Covering slabs to 6th cross road of 5th Block Bhuvaneshwarinagar in Ward no. 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHARISH CONSTRUCTIONS9448068702Final0000352013-08-01T00:00:0000002530-Sep-2013
000228

30-Sep-2013
1304-Jun-2015000002 / 05-Jun-2015 in RTGS1017325Ten Lakh Seventeen Thousand Three Hundred Twenty Five153870One Lakh Fifty Three Thousand Eight Hundred Seventy 863455Eight Lakh Sixty Three Thousand Four Hundred Fifty Five
<0>159159183-13-0000162013-08-01T00:00:002013-09-28T00:00:00Improvements to drains and Providing Covering slabs to 6th A 7th A cross road of Omshakthinagar in Ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP1771 Zone Works - POW WorksHarish Constructions9448068702Final0000362013-08-01T00:00:0000002430-Sep-2013
000229

30-Sep-2013
2405-Jun-2015000003 / 06-Jun-2015 in RTGS1494190Fourteen Lakh Ninety Four Thousand One Hundred Ninety 226080Two Lakh Twenty Six Thousand Eighty 1268110Twelve Lakh Sixty Eight Thousand One Hundred Ten
<0>160160183-13-0000262013-03-16T00:00:002013-10-26T00:00:00Providing 250 watts S V fittings and control switches control wires and other connected accessories to Chikkalsandra Bhuvaneshwarinagar ittmadu sri ram Nagara balaji Nagar synicate Bank Colony Kamakya layuout sourrounding area in ward no 183183 ChikkalsandraExecutive Engineer Electrical South ZoneP2178 Works sanctioned by Dy. MayorM/s.KRIDL9448279917Final0002392013-03-16T00:00:009226-Oct-2013
228

26-Oct-2013
177328-Jul-2015000404 / 04-Aug-2015 in RTGS654427Six Lakh Fifty Four Thousand Four Hundred Twenty Seven98416Ninety Eight Thousand Four Hundred Sixteen556011Five Lakh Fifty Six Thousand Eleven
<0>161161183-13-0000222014-01-20T00:00:002014-05-20T00:00:00Improvements to drain and footpath to 80ft road Bhuvaneshwari Nagara to Chikkalasandra main road in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP2178 Works sanctioned by Dy. MayorTECHNICAL MANAGER KRIDL9986697126First and Final0002582013-03-06T00:00:0000002430-Jul-2014
000200

31-Jul-2014
275618-Jun-2016000066 / 23-Jun-2016 in RTGS625519Six Lakh Twenty Five Thousand Five Hundred Nineteen86349Eighty Six Thousand Three Hundred Fourty Nine539170Five Lakh Thirty Nine Thousand One Hundred Seventy
<0>162162183-13-0000202014-02-24T00:00:002014-06-30T00:00:00Improvements to drain with covering slab and deck slab to 2nd 8th 10th 11th main and 9th A cross 10th cross 7th A cross 8th cross 9th cross and cross road BSK 2nd stage Bhuvaneshwari Nagara in ward no 183183 ChikkalsandraExecutive Engineer Padmanabhanagar South ZoneP2178 Works sanctioned by Dy. MayorTECHNICAL MANAGER (3) KRIDL9986697126Final0003552013-03-06T00:00:0000001930-Jun-2014
000143

30-Jun-2014
194706-Jun-2016000049 / 09-Jun-2016 in RTGS9399305Ninety Three Lakh Ninety Nine Thousand Three Hundred Five1690470Sixteen Lakh Ninety Thousand Four Hundred Seventy 7708835Seventy Seven Lakh Eight Thousand Eight Hundred Thirty Five
<0>163163183-12-0000382012-12-17T00:00:002014-03-17T00:00:00Providing 250Watts SV fittings Control wire Control switches Park lightings in ward 183183 ChikkalsandraExecutive Engineer Electrical South ZoneP1828 Provision of Additional Fittings StreetlightsM/s.Narasimha prasanna Electircals9880640008First and Final0001592012-12-17T00:00:00133/1317-Mar-2014
312/13

17-Mar-2014
478409-Jan-2016002290 / 22-Jan-2016 in RTGS78562Seventy Eight Thousand Five Hundred Sixty Two10986Ten Thousand Nine Hundred Eighty Six67576Sixty Seven Thousand Five Hundred Seventy Six