Resettled in the Paths of Floods is a report from IRCDUC from Dec 2023.
It highlights how resettlement in response to floods has tended to settle families in flood vulnerable areas repeatedly.
Master Plan Report For Remodelling of Storm Water Drains in Eight Zones of BBMP Area, Bengaluru is a report from 2010 from BBMP to remodel the stormwater drains.
Polling booth maps for the 28 assembly constituencies in Bengaluru Urban.
The booth info includes booth code, number of people (as per voter records) and ward details (old and new).